Hospitality-NC-v4 MPR3:Must comply with project size requirementsposted by Manzil Shrestha on
"Any single structure that is larger than 25,000 square feet (2 320 square meters) must be registered as a separate
DES - VRF mixed Proposed system
Retail-CI-v4 EAc2:Optimize energy performanceposted by Lorenzo Giannetti on
Hi all,
Turf Grass
NC-v4 SSc3:Open spaceposted by Vaneeza Javed on
Is Normal grass consider in Turf Grass or not?
Open Space and Turf Grass
NC-v4 SSc3:Open spaceposted by Vaneeza Javed on
What does leed implies when it mentions Turf grass and why Turf grass does not count as vegetated area?
Alternative Compliance Paths (ACPs)
NC-v4 EQp1:Minimum indoor air quality performanceposted by Santiago Avila on
Hello everyone,
Thermal compliance of Revolving doors
NC-v4 EAp2:Minimum energy performanceposted by Alokmay Behera on
I am working on a LEED project with revolving doors at the building entrances. The project has a proposed glazing specification.
FEES FOR BASEMENT AREA
posted by Subrota Roy on
Is it necessary to calculate the basement area when we calculate the gross floor area?For feea. If this area is not only used as parking but also used as some function as storage.
Purchasing - Lamps with UV-C
NC-v4 INc1:Innovationposted by on
Does anyone know if the Purchasing - Lamps innovation credit requires reporting of UV-C lights in air handlers (for coil irradiation and virus mitigation)?
Concern regarding entryway systems
EBOM-v4.1 EQc1:Green Cleaningposted by Wafa Arif on
Hello,
Under option 2 - Entryway systems, we need to put in place 10 feet elements in the primary direction of travel.