Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Shuttle services on base

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Sara Heppe  on 

We have a dining hall facility being constructed on a military base.

1
Tue Nov 20, 2012, 1:34 am

Sheetrock - Landill diversion

NC-2009 MRc2:Construction Waste Management
posted by  Mark Cloud  on 

Anyone have any brilliant ideas on what to do with drywall (sheetrock) waste from a major renovation project that we are trying to divert from a landfill but don't have a recycling center within 5

1
Fri Nov 23, 2012, 5:47 am

Naturally Ventilated Space

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Orlin Velinov, PE  on 

We have a tenant renovation project within existing building. Currently the tenant space does not have air conditioning system and is naturally ventilated.

1
Sun Sep 28, 2014, 5:20 am

Relocated Office Equipment

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Elliot Young  on 

I have a large CI project where the client will be moving to a new facility, bringing with them a lot of office equipment they currently are using. Would these credits still be achievable?

1
Mon Nov 19, 2012, 5:10 pm

Waste to energy conversion

Schools-2009 MRc2:Construction Waste Management
posted by  Jesse Stockley  on 

I am trying to select a waste management company. The low bidding company says they have done several leed projects with local contractors.

1
Fri Nov 23, 2012, 12:04 am

Licensed Professional Exemption

General forums
posted by  Ameet AA  on 

Hi James with regards to Licensed Professional Exemption please find the details at the bottom of the page in the following link https://www.leedonline.com/irj/servlet/prt/portal/prtroot/docs/gui

0

Electric Bike Fleets are ZEV's so...

Healthcare-v2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  John Chinnery  on 

What are the best ways to maximize the value of a network of ebikes. This ZEV fleet would be checked out for clean trips and returned to storage when done.

0

Clean Room Protocol and SMACNA standards

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Charlie Popeck  on 

We are currently working on a LEED project where a significant portion of the finished space will classify as “Clean Room” under ISO 14644-1.

0

Status Group Project Certification

LEED Guidance for Campuses and Multiple Buildings
posted by  Elke Malleier  on 

I am a LEED AP and a “newcomer” in the certification process. As AGMBC Guidelines are not clear to me, I went through the forum comments below but I am totally confused now.

1
Fri Nov 23, 2012, 1:48 am

New credits during appeal: does work have to be finished?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Elle Brown  on 

Our client is considering pursuing new credits during the appeal of our final construction review.

1
Fri Nov 16, 2012, 3:58 pm