Automatic Lighting Shutoff for tenant spaces

CS-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

Do tenant spaces need to be included in the areas controlled by the automatic shutoff as mentiaoned in section 9.4.1.1 (ASHRAE 90.1)?

1
Thu Jul 26, 2012, 4:26 pm

U-value unheated/heated slab-on-grade floor

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

Hello. In the building which I’m modeling there is an underground floor whose slab-on-grade floor can be considered as divided in three parts: one part (wellness) is heated with heated floor, anoth

0

Two on/off switches for multi-occupant space

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  SON NGUYEN VAN  on 

Our building had two types of power source, one is normal power, one is essential power (back up by genset) and also supply two kind of power for lighting system.

1
Wed Sep 5, 2012, 12:03 am

V4 or V3 forms for 2009 Core and Shell...

General forums
posted by  shashank jain  on 

Hi we started the project with the Core and Shell... and we saw that the LEED has released V4 forms on the LEED online.. we should be using the V3 (the lEED that we were referring to) or V4...

1
Wed Jul 4, 2012, 6:52 pm

Blower Door Test Required?

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Wei Jiang  on 

We have a high-rise hotel project with all guest rooms in the tower and hotel facalities (restaurants, meeting rooms, gym, etc.) in the podium.

1
Thu Jul 5, 2012, 2:40 pm

district CHP system

NC-2009 EAc1:Optimize Energy Performance
posted by  Giorgia Lorenzi  on 

I am modeling a building which is connected to a district CHP system.

1
Thu Jul 12, 2012, 6:57 pm

Offsite Landscape

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Irina Serrano  on 

I'm working on a project in Sao Paulo, Brazil and our project will implement a green area (1506.95 sf) outside our leed project boundary.

1
Sat Jul 14, 2012, 5:49 pm

Utilizing a Campus Shuttle to connect to Public Transit

NC-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Eamon Geary  on 

For a military base project, the facility is connected to a campus shuttle with 20+ stops.

1
Thu Jul 5, 2012, 8:03 pm

Historical uses

Pilot-Credits SSpc16:Rainwater management
posted by  nancy Charron  on 

I have a urban site project that has had 2 prior buildings before this one. The most recent prior historical use was all impervious surfaces.

1
Tue Sep 4, 2012, 8:37 pm

Building Flush Out - Chilled Beams / Radiant Cooling

CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Nandana Kumar  on 

We have couple of projects where the HVAC system is being served by Chilled Beams and Radiant Cooling.

1
Fri Jul 6, 2012, 3:34 pm