Automatic Lighting Shutoff for tenant spaces
CS-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
Do tenant spaces need to be included in the areas controlled by the automatic shutoff as mentiaoned in section 9.4.1.1 (ASHRAE 90.1)?
U-value unheated/heated slab-on-grade floor
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
Hello. In the building which I’m modeling there is an underground floor whose slab-on-grade floor can be considered as divided in three parts: one part (wellness) is heated with heated floor, anoth
Two on/off switches for multi-occupant space
EBOM-2009 IEQc2.2:Controllability of Systems—Lightingposted by SON NGUYEN VAN on
Our building had two types of power source, one is normal power, one is essential power (back up by genset) and also supply two kind of power for lighting system.
V4 or V3 forms for 2009 Core and Shell...
posted by shashank jain on
Hi we started the project with the Core and Shell... and we saw that the LEED has released V4 forms on the LEED online.. we should be using the V3 (the lEED that we were referring to) or V4...
Blower Door Test Required?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Wei Jiang on
We have a high-rise hotel project with all guest rooms in the tower and hotel facalities (restaurants, meeting rooms, gym, etc.) in the podium.
district CHP system
NC-2009 EAc1:Optimize Energy Performanceposted by Giorgia Lorenzi on
I am modeling a building which is connected to a district CHP system.
Offsite Landscape
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Irina Serrano on
I'm working on a project in Sao Paulo, Brazil and our project will implement a green area (1506.95 sf) outside our leed project boundary.
Utilizing a Campus Shuttle to connect to Public Transit
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Eamon Geary on
For a military base project, the facility is connected to a campus shuttle with 20+ stops.
Historical uses
Pilot-Credits SSpc16:Rainwater managementposted by nancy Charron on
I have a urban site project that has had 2 prior buildings before this one. The most recent prior historical use was all impervious surfaces.
Building Flush Out - Chilled Beams / Radiant Cooling
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nandana Kumar on
We have couple of projects where the HVAC system is being served by Chilled Beams and Radiant Cooling.