shuttle service instead of preferred parking space
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Karyn Rodrigues on
Our LEED CI project is inside of a LEED CS retrofit. For SS3.3 my client falls under the CASE 1.
PV Installation during EAp2 and EAc1 performance period
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by David Tompos on
My group is currently planning to have photovoltaic panels and the appropriate electricity meters installed on the LEED EBOM project building.
Fume hood & Isolated Exhaust Requirement
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maggie Hogan Skaug on
Our client has a fume hood in one of their laboratories but it is not within an enclosed room all to itself.
question
posted by Tarek Dalati on
my project is composed of a 52 residential building and 2 retails (g+1 and G+2) they are in the same project boundary and fed from the same HVAC systems ( chillers and boilers) the retails are bas
Salvaged granite block
NC-2009 MRc3:Materials Reuseposted by Sara Sweeney on
Hi I am working on a project where 83.75 tons of granite slabs were removed from a site during site clean-up for the new bilding being built.
Private Lav Faucets - Baseline vs. Metered Design
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Vincent Pieri on
We are working on a single floor, single tenant project with several fixture group assignments.
multiple buildings energy modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
My project consist of a mixed used tower (G+52 floors) and 2 detached building ( be fed from the same cooling and heating system ) but they are core and shell and I m persuing LEED NC 2009 honestly
Deadline for project submission
posted by Peggy Brock on
Project deadlines are found in the Certification Policies Manual starting on page 16 and rating system specific deadlines are in the appendices starting on page 31.
Refrigerators
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Rebecca Nelson on
I want to be able to supply to LEED certified buildings and customers. To apply towards a LEED credit, do refrigerators and refrigerator-freezers only need to meet EnergyStar requirements?
Defining "One Building"
posted by Chris DeVolder on
I'm curious how others would interpret MRP 2 Must be a Complete Building or Space as it relates to an outdoor sports facility. The facility has a series of 'buildings' that are connected (some cont