Forum quick links
Bicycle Storage for a Daycare
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by komal kotwal on
We are pursuing a daycare center under LEED NC v2009.
High Rise Residential - smoke detector/CO2 mon. combined device?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Abena Darden on
Hi All -- I see my question might already be partially answered in the conversation from May 28, 2013.
Campus DES Cx - LEED Submittal Requirements
NC-2009 EAc3:Enhanced Commissioningposted by Everardo Ocampo on
I'm working on a project at a Campus where an existing DES is being retro-commissioned. The DES will serve a new LEED building that is attempting to attain EA c3 (Enhanced Cx).
Sound absorption coefficient data
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Monica Alicea on
Hello, We are working on filling out the Sound Absorption coefficient data in Table IEQp3-3.
double charged?
posted by Jean Marais on
I'm appealing WEp1. We built in extra water saving measures. It seems that leedonline wants to charge me to update WEc3. Surely that is not fair.
Naturally ventilated offices- mild temperate climate-loads unmet
NC-2009 EAp2:Minimum Energy Performanceposted by Paul Overy on
We have a narrow plan 3 storey naturally ventilated building with radiators (baseboard) in temperate Ireland. Some windows are user controlled and some controlled by the BMS, with night purge.
Receptacle equipment in a Core&shell office building
CS-2009 EAp2:Minimum Energy Performanceposted by Eleftherios Zacharakis on
When using Table G-C in User's Manual for ASHRAE Standard 90.1-2010 to define the receptacle equipment power density in an office building, shall I assume that even the Servers power density is inc
MERV 13 requirement in tall buildings
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Bilge Ceylan on
I am working on a CI project which is in a tall building.
LEED for Homes (International)
posted by Maya Karkour on
Dear Sirs, I Was wondering whether the LEED for Homes scheme is now available for international projects.
Doubt related with calculation procedure
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Ricardo Sá on
I have some doubts related with this credit in a specific project with the following characteristics: - The majority of the site area collect run-off water to one lake installed on-site, and also