The project can comply with the requirements of the credit if the project team can show that the relevant criteria have been met for all HVAC systems serving the area within the project scope, whether or not the HVAC systems are installed as part of the tenant scope of work.

What is meant by "relevant criteria"? Do the HVAC systems have to comply with EAp2, Min. Energy Perf. to be used in this credit?