Forum quick links
Combined Waste Stream Audits
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Elizabeth Felder on
Hello! I am working with two properties that are pursuing LEED certification separately.
how to demonstrate compliance with natural ventilation in apts?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Courtney Royal on
All other regularly occupied spaces, besides the residential apartments, have been entered correctly using the thermal comfort tool. These spaces are mechanically ventilated.
Backup documentation for MRc4 & MRc5
NC-2009 MRc4:Recycled Contentposted by Felipe Martinez on
What percentage of backup documentation (Invoices, letters, etc,.) do i have to submit for all the materials that are listed in the LEED form cut-sheet submitted in the application process?
IEQc8.2 Exemplary Performance
CS-2009 IEQc8.2:Daylight and Views—Viewsposted by Brian Harris on
For Measure 4 of this credit, how do I determine if the View Factor is 3 or greater?
AHUs not within tenant space
CI-2009 IEQp1:Minimum IAQ Performanceposted by Mike D on
If the AHUs are not located within the tenant space, do we still have to include information about it?
Natural gas use less than 1MMBtu...can't obtain carbon offsets
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Wendy Parker, LEED AP on
We have purchased our REC's for our building's electricity use but have been unable to find anyone that offers carbon offsets for our natural gas use because it's so low (less than 1MMBtu a year).
Asbestos Abatement Documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Heather Holdridge on
We are developing on an existing site that requires asbestos abatement, so we're pursuing this credit under the third option.
Grass pavers?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Q + on
Good morning. Anyone know if grass pavers count as hardscape?
LEED v4 Green Associate
posted by Tonima Ferdous on
I am planning to take the exam in September 2014. However, I came to know that the study guides will not be released until Fall 2014 (I am not sure about the specific date of release though).
Material Reuse - Fill from crushed onsite materials
NC-2009 MRc3:Materials Reuseposted by Amy Hockett on
I have heard differing viewpoints on this topic of crushed existing building materials as fill onsite qualifying for this credit...?