ASHRAE 90.1.2010 - Baseline System using Exception of G3.1.1
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi,
Greetings!
LEED v5:NC Clarification on suitability of minimum energy performance data center calculator to claim savings and confirming climate zone
NC-v5 EAp2:Minimum Energy Efficiencyposted by Sanket Sabale on
Hello team,
Good afternoon. While working on LEED v5 BD+C data center project in Frankfurt, Germany we are seeking for clarification on following queries
Biomass Process Steam
NC-v4 EAc5:Renewable energy productionposted by Keerthi Ratnayake on
Can steam produced from an on-site biomass boiler and used exclusively for manufacturing process loads be counted toward EA Credit: Renewable Energy Production in LEED v4 BD+C?
Option 3: Design for Flexibility, Plug-and-play lighting controls
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Crista Shopis on
I'm exploring this as a 3rd option for the Interiors Life-cycles credit but I have not found a example in these forums of this option being included in a successful submission.
Option 3 flexible lighting control system required documentation
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Alara Brinton on
I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.
Prevention through Design
NC-v4 INc1:Innovationposted by FUTING LI on
For projects located in China, can local national safety standards be used as an equivalent alternative to OSHA standards for this credit?
Design submittal or construction submittal
Pilot-Credits IPpc93:Prevention through Designposted by Dionisio Franca on
Is there any guidance on whether this credit can be submitted during the design submittal?
Pursuit of Social Equity Within Project Team
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Patty Marr on
Our team is pursuing this pilot credit.
Is a TVOC emissions evaluation for an epoxy flooring system's topcoat acceptable?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Lutfi-Hisham Muhammed on
We are managing the new construction of a pharmaceutical production facility where we have an epoxy flooring system to be installed which consists of a primer, application of the main product (prod