Forum quick links
Baseline fan motor efficiency
NC-v4 EAp2:Minimum energy performanceposted by Simon Dellacher on
System fan power is calculated per ASHRAE 90.1-2010 Appendix G3.1.2.10, where for the systems 3 through 8 fan motor efficiency is part of the formula.
Koolshade as glare-control
NC-v4 EQc8:Quality viewsposted by Audrey LEDESERT on
We are working on a project that plans to put a Koolshade glare control (microlouver - https://www.smartlouvre.com/).
LEED Recertification
posted by Fabian Garcia on
I have a project that was certified under LEED v2009 in 2015. In 2020, is LEED v4.1 the only available pathway for recertification or can we pursue LEED v4?
How can I calculate Materials and Resources by Default materials cost
NC-2009 MRc3:Materials Reuseposted by mohamed nur hashi on
I am a student and I am working on leed material calculation.
System without simultaneous Cooling and Heating
Hospitality-NC-v4 EQc5:Thermal comfortposted by Ricardo Sá on
Dear All,
Pilot Credit Alignment with others
Pilot-Credits EApc66:Community contaminant prevention - airborne releasesposted by Kelsey Wotila on
This credit aligned with our project’s goals to provide an energy efficient building.
MRp2/c5 -- Can we count shipping dunnage returned to precast manufacturer as material reuse?
NC-v4 MRp2:Construction and demolition waste management planningposted by Terry Thornsbury on
We have a large (800,000sf) project that is being constructed primarily using precast floor decks and architectural wall panels.
Can consider sports club as public assembly to select baseline system
NC-v4.1 EAp2:Minimum Energy Performanceposted by Amal Venugopal on
Hi All,