Option 3 - Measurement
CI-2009 IEQc8.1:Daylight and Views—Daylightposted by Robin Bass on
My team opted to use the measurement approach to document this credit for a recent 48,000 sq ft interior project.
Code defines Maximum Open Space
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Daniel Hartsig on
Hello Everyone- I'm currently working on a project where the local code defines no minimum amount of open space. Instead, they define a maximum amount of open space (at 19% of site area).
Mandatory provision in LEED CS
CS-2009 EAp2:Minimum Energy Performanceposted by Roger Moquin on
We actually construct a high rise office building with commercial area at the first level.
What about SIPs?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Nelina Loiselle on
Would structural insulated panels made from PS foam cores sandwiched between OSB (Oriented Strand Board) panel faces qualify?
What about for an initial interior fit-out?
Pilot-Credits PC20:Recycled Contentposted by Habitech Distretto Tecnologico Trentino on
Hello all. I am working on a LEED-CI project. The situation is an initial interior fit-out (build-out of areas where there are no existing interior walls, finishes, etc.) and the tenant's scope of
Insulation requirements
CS-2009 EAp2:Minimum Energy Performanceposted by Gabriela Hernández Castillo on
Our LEED building consits on an 39 stories speculative office building that is on top of a 3 stories retail building. The retail will not apply for LEED certification.
Undeveloped land - definition
Schools-2009 SSc1:Site Selectionposted by Gendel Metlitsky on
The 3.5 acre project site is wooded with mature trees.
Asphalt Roll Roof Recycling
NC-2009 MRc2:Construction Waste Managementposted by Sabrina B on
I am working on a existing building renovation. The existing roof, which will be demo'd, is asphalt roll with batt insulation underneath.