Leed boundary for commercial interior

CI-2009 PIf1:Minimum Program Requirements
posted by  Elena Gonzi  on 

Hi, I have some question about LEED Commercial Interior certification : 1) Situation: we have a offices building that has a basement in common with other two offices buildings.

1
Wed Dec 30, 2015, 5:09 pm

Recycling Batteries

NC-2009 MRc2:Construction Waste Management
posted by  Paola Medina  on 

One of our environmental companies have a lot of batteries that they want to recycle in our LEED project instead of send to landfills through encapsulate with concrete in the background hole of ele

1
Mon Sep 28, 2015, 9:13 pm

Mandatory requirements

NC-2009 EAp2:Minimum Energy Performance
posted by  Rathnashree Bharadwaj  on 

Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.

1
Fri Sep 25, 2015, 2:56 pm

LOCAL PLASTER COMPLIANCE PRODUCT

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  MARIA FERNANDA CORREA MENDIVELSO  on 

HI... How is the way for document compliance for a local product made with plaster and Shintech PVC Resin wich is used before apply final paint. Thanks

1
Wed Feb 3, 2016, 1:06 am

IEQp1 Reductions in supply air flows due to occupant adjustments

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Olga Yuil  on 

We have a Commercial Interior Project with underfloor air distribution (UFAD) system designed to include adjustable supply air diffusers in the floor, which can be used to adjust the amount of supp

1
Tue Jan 5, 2016, 5:39 pm

LEED v4 BD+C - Core and Shell : Renewable energy production

CS-v4 EAc5:Renewable energy production
posted by  Spyridon Kostopoulos  on 

Can anyone clarify for me please if for a Core and Shell certification, the total building energy costs would pertain only to those building installations which the developer controls and not those

1
Wed Sep 30, 2015, 5:03 pm

Prescriptive method

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Emmanuel Pauwels  on 

Can we use the prescriptive method if there is a fixed exterior brise soleil in the façade? Can we use the 63 angle from the brise soleil to exclude part of the daylight area?

1
Mon Oct 19, 2015, 4:33 pm

Schools project - large playing fields and open area

Pilot-Credits PC14:Walkable Streets
posted by  Helen Kessler  on 

Would a project with large playing fields and open area have any possibility of meeting this credit requirement?

0

Selecting system type

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have a project that consists of both residential and non residential units. Per 90.1 2007G3.1.1 exception a. we need to use two HVAC system types for residential and non-residential separately.

1
Wed Sep 30, 2015, 5:00 pm

car pool requirement vs no car for commuting restriction

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Noriko Nagazumi  on 

LEED NC SSc4.4 requires preferred parking for carpool or vanpools for 5% of total parking spaces. In our project of a company’s head quarter, there are certain numbers of parking will be installed

1
Fri Nov 27, 2015, 4:31 am