Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED Options

LEED Rating System Selection
posted by  Ran Zhang  on 

A client of mine just bought a partial complete building, which is bascally a shell of concrete structure but intended to be a commercial office building for leasing after full completion.

1
Mon Apr 7, 2014, 4:09 pm

BOD

LEED Rating System Selection
posted by  Ebenezer Natoplag  on 

Can somebody give me a copy of LEEDuser (BOD Document) - Basis of Design

1
Wed Apr 2, 2014, 1:05 pm

Measurement at DOAS before fixed dampers

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Noriko Nagazumi  on 

From the reference guide: "Show compliance with the applicable requirement above through measurements taken at the system level (i.e., the air-handling unit).

1
Fri Apr 11, 2014, 8:14 pm

ASHRAE and voltage drop

CS-2009 EAp2:Minimum Energy Performance
posted by  BH .  on 

ASHRAE puts a requirement to keep in electrical services on the feeders max 2% voltage drop and on the branch circuits max 3%.

1
Wed Apr 2, 2014, 2:15 pm

Spot Metering for CI 2009 EAc3 Option B

CI-2009 EAc3:Measurement and Verification
posted by  Michael Hill  on 

I am working on a project which is considering pursuing CI 2009 EAc3 Option B. I am wondering if continuous metering is required for this path or if spot metering would be acceptable.

1
Mon Apr 7, 2014, 1:15 pm

purchasing merchandise for resale

EBOM-2009 IOc1:Innovation in Operations
posted by  ethan adams  on 

We are a non-profit org. with a modest, but growing, merchandise sales program.

1
Wed Apr 30, 2014, 4:07 pm

CAMPUS Approach For Rainwater Management

EBOM-v4 SSc2:Rainwater management
posted by  Patricia Andrasik  on 

I am currently analyzing and attempting to achieve the Campus credit for Rainwater Management for a university that is projected to change in the following 5-10 years.

1
Thu Apr 10, 2014, 8:41 pm

Carpet over asbestos tile

NC-2009 MRc2:Construction Waste Management
posted by  PATRICK HILLIER  on 

As part of the owners precronstuction abatement flooring adhered to hazardous floor tile was removed by an abatement contractor.

1
Thu Apr 3, 2014, 3:34 am

Apply to LEED Committees by April 10

Pilot-Credits LTpc70:Green vehicles
posted by  Christopher Law  on 

Hi experts, Wanted to notify those subscribed to this forum of the ongoing LEED Committee Call for Volunteers. This opportunity is open until next Thursday, April 10th at 8:00 pm EST.

0

Apply to LEED Committees by April 10

General forums
posted by  Christopher Law  on 

Hi experts, Wanted to notify those subscribed to this forum of the ongoing LEED Committee Call for Volunteers.

0