Breakdown of energy use

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Gustavo De las Heras Izquierdo  on 

It is required by the credit: "to document the breakdown of energy use in the building". Is it mandatory to have permanent energy meters by end use in order to meet this requirement? What other m

1
Tue Mar 25, 2014, 6:05 pm

Exemplary Performance Compliance

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Eddie Cuevas  on 

I am currently working on a nonresidential project on a college campus that is seeking to obtain an EP point by implementing parking for high-occupancy vehicles.

1
Fri Jul 25, 2014, 5:24 am

LEED Rating System for Food Service Renovation in Dormitory

LEED Rating System Selection
posted by  Cassandra Coffin  on 

What LEED rating system would I use for a food service renovation in an existing dormitory? The building was built in 1927 and has had 6 renovations, the last of which was in 1984.

1
Tue Apr 1, 2014, 12:07 am

developer owned design build project

NC-2009 EAc3:Enhanced Commissioning
posted by  Chris Flint Chatto  on 

We are working on a design-build team developing a project that will be leased to a government agency.

1
Wed Apr 2, 2014, 1:51 pm

Sensor Type Flush Fixtures

CI-2009 WEc1:Water Use Reduction
posted by  Katherine Ann Resurreccion  on 

Hi Would Sensor activated flush fixtures like urinals and WCs have the same flow rate calulations as a sensor type flow fixture? Would it follow the default 12sec / 60 cycle?

1
Wed Mar 26, 2014, 12:31 pm

Not Regularly occupied

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Phillip Cook  on 

In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.

1
Wed Aug 6, 2014, 4:10 pm

Car park in basement

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Mike D  on 

If only four car parking spaces are located within the basement of the building, will they require separate exhaust even if they are not used regularly?

0

Late Start

Hospitality-NC-v4 IPc1:Integrative process
posted by  Annie Hwang  on 

We are in the final stages of completing construction documents for a new construction hotel. The owner recently expressed an interest in having the hotel LEED certified.

1
Wed Mar 26, 2014, 6:37 pm

Upgrades

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Andres Giraldo  on 

Hi, If I did a narrative description about the HVAC at the begining of LEED project (PIf4), but know we have done some updates because of the level 1 audit, so do I need to change the HVAC narrativ

1
Wed Mar 26, 2014, 4:36 pm

Bonus points?

NC-2009 MRc2:Construction Waste Management
posted by  Craig Mahoney  on 

Hello, I work for a commercial waste hauler and C&D recycling facility. We have recently started recycling scrap drywall from new construction projects.

1
Wed Mar 26, 2014, 10:21 pm