Breakdown of energy use
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Gustavo De las Heras Izquierdo on
It is required by the credit: "to document the breakdown of energy use in the building". Is it mandatory to have permanent energy meters by end use in order to meet this requirement? What other m
Exemplary Performance Compliance
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Eddie Cuevas on
I am currently working on a nonresidential project on a college campus that is seeking to obtain an EP point by implementing parking for high-occupancy vehicles.
LEED Rating System for Food Service Renovation in Dormitory
posted by Cassandra Coffin on
What LEED rating system would I use for a food service renovation in an existing dormitory? The building was built in 1927 and has had 6 renovations, the last of which was in 1984.
developer owned design build project
NC-2009 EAc3:Enhanced Commissioningposted by Chris Flint Chatto on
We are working on a design-build team developing a project that will be leased to a government agency.
Sensor Type Flush Fixtures
CI-2009 WEc1:Water Use Reductionposted by Katherine Ann Resurreccion on
Hi Would Sensor activated flush fixtures like urinals and WCs have the same flow rate calulations as a sensor type flow fixture? Would it follow the default 12sec / 60 cycle?
Not Regularly occupied
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Phillip Cook on
In LEED v2009, if a project has less than 1 annualized FTE occupancy it was not possible to achieve any of the IEQ points.
Car park in basement
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Mike D on
If only four car parking spaces are located within the basement of the building, will they require separate exhaust even if they are not used regularly?
Late Start
Hospitality-NC-v4 IPc1:Integrative processposted by Annie Hwang on
We are in the final stages of completing construction documents for a new construction hotel. The owner recently expressed an interest in having the hotel LEED certified.
Upgrades
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Andres Giraldo on
Hi, If I did a narrative description about the HVAC at the begining of LEED project (PIf4), but know we have done some updates because of the level 1 audit, so do I need to change the HVAC narrativ
Bonus points?
NC-2009 MRc2:Construction Waste Managementposted by Craig Mahoney on
Hello, I work for a commercial waste hauler and C&D recycling facility. We have recently started recycling scrap drywall from new construction projects.