Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

10% exclusion of square footage "defined" for EBOM credits

NC-2009 PIf2:Project Summary Details
posted by  Wendy Parker, LEED AP  on 

Does the 10% excluded square footage for one credit (allowed in EBOM 2009) have to be the same excluded square footage used in another credit?

1
Fri Nov 22, 2013, 6:26 pm

four IEQc3.2 questions....

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Carrie Laurendine  on 

1) ive looked at space matrix (this is a library project)... from what i gather EVERY space has to count.. even spaces not regularly occupied (mech closet, janitor closet, etc).

1
Sat Nov 16, 2013, 2:07 am

24 Month Performance Period vs Certification Application

Performance Period
posted by  Eric Pasi  on 

Greetings LEED Experts, I'm a little hung up on the 24 month maximum performance period vs the 60 day grace period for submission.

1
Fri Nov 8, 2013, 7:44 pm

LEED-NC 2009 with a future tenant space

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Derek Breuninger  on 

Our building project has a very small future tenant space.

1
Fri Dec 20, 2013, 11:08 pm

can partial credit be earned?

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Becky Dix  on 

Our project is an expansion to a facility that hosts events/conferences in addition to its normal use as a lab facility, and while daily use would not require all the parking necessary by code, the

1
Wed Nov 20, 2013, 8:53 pm

Acrylic enamel/lacquer in aerosol, non-flat

CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Alicia Villanueva  on 

Good afternoon, does anyone know the VOC allowance for an acrylic enamel/lacquer in aerosol, non-flat? I do not know in which product type does this product falls into to take the VOC limit. Thank

1
Thu Jun 19, 2014, 3:44 pm

Automatic controls required?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Nicole Kimoto  on 

I have a project that has a shop areas where building occupants will be working. It is very important that the light not turn off automatically when they are working.

1
Fri Nov 8, 2013, 11:12 pm

Documentation of Comingled Waste

CS-2009 MRc2:Construction Waste Management
posted by  Panupant Phapant  on 

If on site have some commingled waste , LEED Online form require us to provide supporting document. I wondering that what kind of this document? and What the topic are will involve in this?

1
Sun Nov 10, 2013, 3:41 pm

HVAC System Type for Baseline Case

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Hello, I have a question on which HVAC system type to choose for the baseline case for a project consisting of 4 buildings.

1
Mon Nov 11, 2013, 5:37 pm

exhaust from recycle storage room?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Carrie Laurendine  on 

does the room that contains recycle storage bins need to be exhausted to the exterior?

1
Mon Nov 11, 2013, 11:04 pm