10% exclusion of square footage "defined" for EBOM credits
NC-2009 PIf2:Project Summary Detailsposted by Wendy Parker, LEED AP on
Does the 10% excluded square footage for one credit (allowed in EBOM 2009) have to be the same excluded square footage used in another credit?
four IEQc3.2 questions....
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Carrie Laurendine on
1) ive looked at space matrix (this is a library project)... from what i gather EVERY space has to count.. even spaces not regularly occupied (mech closet, janitor closet, etc).
24 Month Performance Period vs Certification Application
posted by Eric Pasi on
Greetings LEED Experts, I'm a little hung up on the 24 month maximum performance period vs the 60 day grace period for submission.
LEED-NC 2009 with a future tenant space
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Derek Breuninger on
Our building project has a very small future tenant space.
can partial credit be earned?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Becky Dix on
Our project is an expansion to a facility that hosts events/conferences in addition to its normal use as a lab facility, and while daily use would not require all the parking necessary by code, the
Acrylic enamel/lacquer in aerosol, non-flat
CS-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Alicia Villanueva on
Good afternoon, does anyone know the VOC allowance for an acrylic enamel/lacquer in aerosol, non-flat? I do not know in which product type does this product falls into to take the VOC limit. Thank
Automatic controls required?
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Nicole Kimoto on
I have a project that has a shop areas where building occupants will be working. It is very important that the light not turn off automatically when they are working.
Documentation of Comingled Waste
CS-2009 MRc2:Construction Waste Managementposted by Panupant Phapant on
If on site have some commingled waste , LEED Online form require us to provide supporting document. I wondering that what kind of this document? and What the topic are will involve in this?
HVAC System Type for Baseline Case
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Hello, I have a question on which HVAC system type to choose for the baseline case for a project consisting of 4 buildings.
exhaust from recycle storage room?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Carrie Laurendine on
does the room that contains recycle storage bins need to be exhausted to the exterior?