Comprehensive waste reduction program

NC-2009 IDc1:Innovation in Design
posted by  Magda Aghababyan  on 

If a manufacturing plant decides to do a comprehensive waste stream audit for its entire manufacturing process and implement a waste reduction plan will it be considered as an innovation credit? T

1
Mon Jul 1, 2013, 3:55 am

Stormwater to public rainwater channel that is connected to sea

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Lise Dannesboe  on 

Our building is connected to a public rainwater channel which is placed out of the LEED boundary, the rainwater channel is connected to the sea.

1
Mon Jul 1, 2013, 4:45 pm

Defining "Footprint" when the Building is on a slope

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Amit Ahiel  on 

Our project is on a sloped site so the main entry (we call it "ground floor") in above another entry point where part of the building is embedded in the earth.

1
Sun Nov 3, 2013, 2:46 am

Warehouse -

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Devani PERERA  on 

Hi, I am working on a warehouse project.

1
Tue Jul 2, 2013, 1:39 am

Projects outside US

LEED Rating System Selection
posted by  FRAGKISKOS LEVANTIS  on 

What is the official reference guide for countries outside US for New Construction and Major Renovations (LEED 2009).

1
Mon Nov 4, 2013, 2:48 am

MPR #6 modification

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Ron Dean  on 

Hello, I've seen in leedonline for a recently registered project I'm working on that this form (PIf1) has been updated from version 4.0 to 5.0.

1
Tue Nov 5, 2013, 1:57 pm

Measurements

Pilot-Credits EQpc24:Acoustics
posted by  Anulak Siwabut  on 

I don't see specified in the documentation the extent of measurements required in order to meet this credit.

1
Mon Nov 25, 2013, 6:13 pm

Manufacturer specs required or are nameplates sufficient?

EBOM-2009 EAp3:Fundamental Refrigerant Management
posted by  Alice Cook  on 

Are you required to provide the manufacturer's specifications, or is it enough to upload the nameplates to LEED?

1
Sun Sep 8, 2013, 5:53 pm

Access to Public Spaces

Pilot-Credits PC14:Walkable Streets
posted by  Jennifer Preston  on 

Is there a requirement or guideline as to how far from the project site the public spaces/squares/plazas need to be?

0

"Submit feedback survey"

Pilot-Credits PC14:Walkable Streets
posted by  Jennifer Preston  on 

Does the "feedback survey" refer to the "Additional Questions" listed on the Bird's Eye View tab? Or is there another survey that this is supposed to be linked to?

1
Tue Nov 5, 2013, 5:42 pm