Process Equipment Refrigerant
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Jalal Avades on
I have a school building with an old walk-in coolers/freezers used in the Kitchen. Those do have CFC refrigerant.
Group project certification and PIf2
posted by Noriko Nagazumi on
The following message appears if a total of more than one building is selected in "Number of buildings attempting certification as part of this LEED Application:" at PIf2: "At present, only one bui
Plant space in Default occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Mike D on
We have included all areas of the building within the Default Occupancy Table. However, there is still the Plant Space we have not included. Can this be omitted?
PVC for disabled access
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Esther Izquierdo on
In our CI project the architect will specify carpet as a finish to the existing raised floor.
Storage Equipment
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Jeremy Kuhre on
We are currently pursuing this credit for a GSA project. All systems furniture is GreenGuard certified. There is some miscellaneous metal shelving and bulk storage however that is not certified.
US american REC´s for european projects
NC-2009 EAc6:Green powerposted by Doreen Kruschina on
Hi, we recently received an ad promoting the sales of US-american REC´s that would count towards the green power credit. Anyone familiar with www.renewablechoice.com? Thanks
Multiple Buildings Question
posted by Lawrence Lile on
I have a similar situation to the post above.
Reference Building
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Mark Webster on
How have project teams been defining the reference building for this credit?
Vehicle maintenance and storage
NC-2009 PIf1:Minimum Program Requirementsposted by Lawrence Lile on
I would like to determine if a project could be certified.
Gerrymandered site?
posted by Lawrence Lile on
I have a LEED project that includes three buildings and a large constructed wetlands, however there is an existing building smack in the middle of them.