Forum quick links
Projects outside the U.S.
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Stefanie Hoffmann on
Dear all, Having worked on a LEED EBOM project in Helsinki, Finland, where we were unfortunately not able to fulfill one of the prerequisites (EAp2), motivated me to dedicate my bachelor's thesis t
Projects outside the U.S.
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Stefanie Hoffmann on
Dear all, Having worked on a LEED EBOM project in Helsinki, Finland, where we were unfortunately not able to fulfill one of the prerequisites (EAp2), motivated me to dedicate my bachelor's thesis t
Temporary carpets / rugs
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Maya Karkour on
Hello, Do roll-out carpets / rugs usually used in residential apartments need to be certified?
Planned Transfer Center
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Josh Mauldin on
My project is a fire station that is the first project on the site of a mixed use development. A bus transfer center is planned to be built directly across from the fire station.
Section 1.4: Mechanical System Design Criteria
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Nick Chiarelli on
If I could get some clarification on this section it would be a huge help! Total project space load (heating and cooling): Is this the sum of all seperate max space loads or is this the load of th
Crawl space included in GSF? Interior courtyards?
NC-2009 PIf2:Project Summary Detailsposted by Michael Wironen on
We have a fairly complicated building project that includes two areas that are unclear to me as to whether they should be included in the gross floor area calculation: 1.
Serving all occupants
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Jennifer Benedict on
I am building a new tower right next to an old tower, connected by an existing parking garage. Our LEED boundary is just the new construction.
100% OA VAVs
CI-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Jeremy Kuhre on
We are remodeling two floors of a high-rise office tower. A 100% OA VAV introduces OA into the mechanical room for each floor where it is mixed with return air.
Cooling Tower Submetering
NC-2009 EAc5:Measurement and Verificationposted by Saju Varghese on
Under the reference guide, it is requiring for process water to be submetered, which according to the glossary involves cooling tower water, boilers and chillers, but if the cooling tower is servi
Tables not displaying
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Nelina Loiselle on
The tables (1-4) referenced in the Credit Language tab do not display. Please advise. Thank you!