Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Paint grip metal SRI

NC-2009 SSc7.2:Heat Island Effect—Roof
posted by  Heather Holdridge  on 

Our project has paint grip metal roof over the structures. We tried to get the SRI value from the manufacturer but could not.

1
Tue Feb 19, 2013, 12:00 am

Rainwater Harvesting Calculator

NC-2009 WEc2:Innovative Wastewater Technologies
posted by  Erin Holdenried  on 

Does anybody know of a good rainwater harvesting calculator online anywhere? Most of the ones I have found do not let you adjust enough of the inputs to be useful.

0

WPC Doors

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Ivan Priatman  on 

The only wood products that I will be using in a project are wood plastic composite doors with no added urea-formaldehyde resins. Will I be able to comply with the credit? Many thanks.

1
Thu Feb 21, 2013, 6:50 pm

Pesticides are not stored or mixed on the building

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Ruba Al-Foraih  on 

We have a contractor that will chemically prepare and store our pesticides in his offices.

1
Thu Apr 4, 2013, 8:49 pm

How to document Squat Toilet/Hole Toilet?

CI-2009 WEc1:Water Use Reduction
posted by  Derek Fung  on 

Currently, I'm working on a CI project in China. The project locates on 19th floor, which shared by two tenants.

1
Thu Mar 21, 2013, 8:37 pm

fillers and epoxies

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Eri Spaulding  on 

Does anybody know what are these products can be categorized as under the VOC limits table? -Heavy Duty Block & Concrete Filler. -Protective & Marine coatings: Water based catalyzed epoxy.

1
Wed Mar 20, 2013, 10:02 pm

applicability of the project

CI-2009 IEQc7.2:Thermal Comfort—Verification
posted by  michele diab  on 

I have read that hotels are elligible for credit IEQ 7.2. If the hotel is composed of branded residences (with a basic kitchen without all equipments) and traditional rooms for the hotel, is it sti

1
Sat Jul 26, 2014, 3:55 pm

3% of the total vehicle parking capacity for a complex

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  MT A  on 

When calculating “3% of the total vehicle parking capacity of the site” as per LEED NC 2009 SSc4.3 Option 1, can we use the total parking capacity associated only with our project program and assoc

1
Wed Feb 20, 2013, 11:05 pm

Sustainable Food policy

EBOM-2009 MRc5:Sustainable Purchasing—Food
posted by  Lee Ann Walling, LEED AP ND   on 

Hi we are a state agency and usually aren't able (by law) to provide food for ourselves with taxpayer funds, nor do we have a cafeteria.

1
Fri Feb 22, 2013, 2:27 am

minimum outdoor air

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

Minimum outdoor air shall be model identically in both the cases. I am confused which outdoor air should be taken from either from IEQ baseline or from actual.

1
Wed Feb 20, 2013, 5:00 pm