Are Clerestory Windows considered a roof, or a window?

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Mark Elsensohn  on 

I am working on a Healthcare v2009 project where we are removing and infilling a bunch of clerestory windows.

1
Fri Feb 1, 2013, 10:58 pm

Enclosed Room?

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Carrie Laurendine  on 

Can the "dedicated space" be a space set aside in part of a bigger "back of house" service room (near loading dock)?

1
Wed Jan 30, 2013, 11:30 pm

weather file

NC-2009 EAc1:Optimize Energy Performance
posted by  Sonia Martini  on 

Hi What's the necessary documentation needed when submitting a simulation run with a self-made weather file (based on historical data)? Thanks Sonia

1
Thu Jan 31, 2013, 1:59 pm

Minimum number of equipments to be audited

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  ESD Singapore  on 

Hi all, The project that we are working on would like to go pursue this credit using ASHRAE level 2 commissioning audit path. However, this project has a large quantity of AHUs and FCUs (approx.

1
Fri Feb 1, 2013, 12:51 pm

exhaust systems for hazardous gas and chemical use areas

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Adam Targowski  on 

All hazardous gas and chemical use areas have to have appropriate ventilation systems.

1
Fri Mar 22, 2013, 5:54 pm

Off-site Native Vegetation

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Phil Meyer  on 

Can anyone clarify how we can achieve SSc5.1 through the use of off-site native vegetation? Do we use an alternative compliance approach and submit forms from LEED EBOM for this same credit?

1
Fri Feb 1, 2013, 3:15 am

Same Fixtures Different Usage Groups

CI-2009 WEc1:Water Use Reduction
posted by  padraic o connell  on 

Hello, I have assigned two fixture usage groups within a building; A daycare usage group (12 FTE) and General Office usage group (140 FTE).

1
Fri Mar 22, 2013, 1:10 pm

Mixed-use model for residential

CS-2009 EAc1:Optimize Energy Performance
posted by  charles bell  on 

RE: LEED CS EAc1 We need input on how to model the 6th floor residential portion of our mixed-use building? Our specific concern is the lighting. Any help is appreciated. Thanks--

1
Thu Jan 31, 2013, 8:52 pm

HCFC 141b For Interior Pipe Cleaning

NC-2009 EAp3:Fundamental Refrigerant Management
posted by  Roberto Meza  on 

Is the complying with the prerrequisite in jeopardy for using HCFC 141b for cleaning the interior of the copper piping previous to installation?

1
Fri Feb 1, 2013, 3:40 pm

dividing project during execution after design final review

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Piotr Nowinski  on 

Hello We are working on the project, which include 3 independent buildings: A, B & C (each 17 stories above grade has own mechanic, energy system and entrances ) and 3 floors underground parkin

1
Fri Feb 1, 2013, 10:45 pm