Forum quick links
Appealing period.
NC-2009 PIf4:Schedule and Overview Documentsposted by Jatuwat Varodompun on
Does the announced holidays of GBCI from 25 feb 2012-1 fan 2013 count as holidays and will not be included in 25 bussiness days of appealing preriod? thanks
How to handle offsite area owned by building owner
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Aron Weis on
The credit form is asking for a contract with the owner of the off-site property.
conflicting info on total materials cost
NC-2009 MRc4:Recycled Contentposted by Carrie Laurendine on
form im filling out says total material cost for csi divisions 3-10, as well as many of the divisions from 31. ive heard others say 31 isn't necessary. just 3-10. whats the consensus?
LI #2500/#10209 Shower Requirements for Mixed Use Buildings
posted by Michelle Rosenberger on
This section is a great idea, thanks.
specifics of signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Carrie Laurendine on
Owner would prefer if the sign did not have the "noisy" icon of a "ghostbusters" red circle with line through it and a cigarette.
US Military Installation Abroad
Schools-2009 SSc1:Site Selectionposted by Denise Shimabukuro on
If the project is located in a foreign country on a US Military Installation, is this considered to be within the US? Technically, the APO Zipcode is California.
Mandatory provision 6.4.1.1 Equipment efficiency.
CS-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I have a question about Mandatory provision 6.4.1.1 Equipment efficiency. Our project is a LEED Core and Shell project and a retail centre, 500 000 foot2.
SF least toxic pesticide list
EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Managementposted by Manasi Kulkarni on
Hi All, Our client is using pesticides which are neither included in SF pesticide list nor active ingredients are found in that list.
compliance with ASHRAE 90.1 2007
CS-2009 EAp2:Minimum Energy Performanceposted by shashank jain on
In order to fulfil the requirements of EAp2 through building simulation, do we need to meet mandatory requirements of ASHRAE 90.1 2007.
Definition of basic services
NC-2009 SSc2:Development Density and Community Connectivityposted by Marcio Alberto Casado Pereira on
Dear all, do the following services count for this credit: - gas station - parking lot structure - vehicle repair shop - football stadium - acquatic park - woodshop Thanks!