Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Exemptions to ASHRAE 90.1 - 2010

NC-2009 EAp2:Minimum Energy Performance
posted by  Maria Fiorelli  on 

Hello all, We're working on a project that has an area that is includeded under exemptions to ASHRAE 90.1-2010 Interior Lighting Requirements.

1
Tue Nov 13, 2012, 3:51 pm

New Construction

NC-2009 PIf1:Minimum Program Requirements
posted by  Hugh Hagues  on 

I have a building opened in 1989. Subsequent extension were constructed in 2003. Can I classify the extensions as "new construction?"

1
Mon Nov 19, 2012, 3:21 pm

Appendix G - Baseline Building Rotations

NC-2009 EAc1:Optimize Energy Performance
posted by  Kalyan Nishtala  on 

Hi All, Are baseline building rotations necessary for a new building that is connected to an existing building. Note that the new building is being modeled as a stand alone.

1
Mon Nov 19, 2012, 5:31 pm

Natural and mechanically ventilated space: hybrid LEED model

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Jeremy Eddy  on 

> I am trying to model a hybrid system in Carrier HAP. We have a VRF system that utilizes dedicated outdoor air at a constant supply CFM as well as standard indoor recirculation units.

1
Fri Nov 16, 2012, 5:24 am

Call-a-Ride as compliant public transport

Schools-2009 SSc4.1:Alternative Transportation—Public Transportation Access
posted by  Todd Bundren  on 

The local metro transit service (public transit services) in my project’s area offers a Call-A-Ride curb-to-curb service for the general public and persons with disabilities.

1
Tue Nov 20, 2012, 2:17 am

Clarification of credit intent and documentation

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Joseph Ford, AIA  on 

I am having difficulty determining if my project can comply with this credit.

1
Wed Dec 12, 2012, 5:19 pm

Kitchen Faucet

CS-2009 WEp1:Water Use Reduction
posted by  ABHIJIT PISAL  on 

The building what we are certifying does not have kitchens or canteen. It only has pantry/breakout areas wherein people have snacks and beverages.

1
Sun Nov 25, 2012, 12:36 am

Per area or Per linear meter requirement?

CS-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

Our project proposed to install facade lighting system. They will use a linear tube lamp and mount it to the facade. The lamp consumption is 3.5W per linear foot.

1
Mon Nov 19, 2012, 4:40 pm

VRV unit with Constant Air Volume system

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Srimannarayana NCVK  on 

Hi We are working on a project where the HVAC system is VRV unit.

1
Fri Nov 30, 2012, 4:49 pm

How can the PV array benefit be shared?

EBOM-2009 EAc4:On-Site and Off-Site Renewable Energy
posted by  Maria Vasapollo  on 

Our campus has multiple buildings, one of which is going for EBOM now. The PV array is adjacent (in the parking lot). The PV's do have a meter, so we know their output.

1
Fri Nov 23, 2012, 8:38 pm