Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Path to Zero Carbon pdfs/word docs

Green Commons
posted by  Kjell Anderson  on 

Hi all - I've heard from a few of you that you are interested in doing a book club or other internal education based on the Path to Zero Carbon.

6
Vice President
Moseley Architects
LEEDuser Premium Member
10 thumbs up
Mon Jun 24, 2024, 7:33 pm

First public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere

LEED v5 BD+C/ID+C: Energy and Atmosphere Public Comments
posted by  Nadav Malin  on 

Share your comments on the first public comment draft of LEED v5 BD+C/ID+C: Energy and Atmosphere category on this forum.

12
Sustainable Design Specialist
Flad Architects
LEEDuser Premium Member
1 thumbs up
Mon Jun 24, 2024, 3:59 pm

Energy Star Rated Equivalent

LEED v4.1 Discussion Forum
posted by  Roshan Pradhan  on 

Does TM-21 tested LED luminaire, with efficiency greater than 94% at 6000 hours meets the alternate equivalent criteria for Energy star rated products?

0

Appendix 2 default values

Calculating FTEs
posted by  Julio Fernandez Amodia  on 

Dear all,

I am currently estimating the occupancy of a mall building. I have determined the occupancy following Appendix 2 default occupancies from LEED.

2
Sun Jun 23, 2024, 9:45 am

Purple Roof

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

Has anyone encountered a project where the client or other circumstances suggested we look into purple roof solution.  From the looks of it, it's a green roof solution with optimized stormwate

2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Sun Jun 23, 2024, 11:50 pm

Entryway system

CI-v4 EQc1:Enhanced indoor air quality strategies
posted by  RAMON CHRISTOPHER MEDRANO  on 

I have a office space project, that will have an entryway system (walk off matt).

4
Sun Jun 23, 2024, 10:02 am
4
Sat Jun 22, 2024, 9:03 pm

Minimum Program Requirements - Must use a reasonable site boundary: site + building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Theresa Lehman  on 

This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals.

1
Fri Jun 21, 2024, 3:29 pm

Pilot Credit INpc155

Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Control
posted by  Roxanne Button  on 

Has anyone attempted this Pilot Credit yet?  Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requiremen

15
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Jun 21, 2024, 2:53 pm