Forum quick links
ASHRAE 90.1-2010 Section 6.5.6.1
CS-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
Modeling a 100% fresh air Makeup AHU (MAHU) in Baseline
NC-v4 EAc2:Optimize energy performanceposted by Hanin Hamdan on
Hi,
Baseline lighting and lighting controls
NC-v4.1 EAp2:Minimum Energy Performanceposted by Samer Hassanie on
Hi,
I have two questions:
Recommendation Request: Green wall vendor in NYC
posted by Jennifer Taranto on
We're looking to add a green wall to our existing offices in NYC. Can anyone please share any good product/vendor recommendations?
Energy Modeling Software
NC-v4 EAp2:Minimum energy performanceposted by Marine Petrosyan on
Hi, All!
Can you please share what energy modeling software you have used so far?
Thank you!
LEED Documentation (MEPC) for Group Approach
NC-v4 EAp2:Minimum energy performanceposted by Apoorva Pradhan on
Hello,
IgCC 2018 and verifying LCA results
posted by Bryna Dunn on
Section 901.5.1.3 of the 2018 IgCC includes a requirement that "A critical review shall be performed by an external expert independent of those performing the LCA." I'm curious
Summit firm surveys
posted by Vikram Sami on
We are in the process of working with our ops people to figure out billability targets for my team.
NO HVAC INSTALATION - C&S IEQ Credit 3.1
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Gabriel Yurevich on
Hi everybody. We are in the design phase of a CS small building certification. In which we dont project any HVAC installaction in scope.
Large-Scale Prefabricated Mass Timber - Does this Exist Anywhere in the US?
posted by Sarah Wood on
I have a client seeking grant funding & they're vetting current US technology around large-scale prefabricated mass timber.