Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

How to quantify a evaporation rate

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Brian Lodes  on 

I was hoping I could get some advice on obtaining the quantity requirement of SS CR 6.1. We are trying to obtain this credit on an approximate 19 acre site.

3
Mon Mar 5, 2012, 2:31 am

Defining Casework/Millwork (MRc6, IEQc4, MRc5)

LEED for Healthcare forum
posted by  Simon Sue  on 

For a current project we would like to clarify how LEED defines casework/millwork across multiple credits: If we would like to pursue MRc6: Design for Flexibility, using the last option "use movab

3
Mon Mar 5, 2012, 2:14 am

How to buy the HC Reference Guide ?

LEED for Healthcare forum
posted by  Mike Barker  on 

I can't find where to buy the Healthcare Reference Guide - it's just not listed on the website ? I must be doing something wrong ?

2
mgr systems engineering
turner healthcare
LEEDuser Premium Member
33 thumbs up
Sun Mar 4, 2012, 7:41 am
3
Default Avatar
designer/arborist
nature's way land care
LEEDuser Basic Member
5 thumbs up
Sat Mar 3, 2012, 2:40 pm

green roof

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Emmanuel Pauwels  on 

We will install an extensive green roof in our project. Does anyone know what the runoff rarte is and how much TSS are captured by 2.7 inches of substrate?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Mar 3, 2012, 2:34 pm

TSS removal efficiency % table?

NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Kash Boodjeh  on 

What is the best resource for finding TSS removal efficiency for various BMPs? Is there a table or reference to base our #s off of since we don't have calculations or on-site monitoring?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Mar 3, 2012, 2:17 pm

Quick clarification

posted by  Wendy Gibson  on 
4
Sat Mar 3, 2012, 1:47 am

Core & Shell M&V

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Randy Cook  on 

Hello, I have read thru the previous posts and responses, and hope this is not a redundant question. I am working on a C&S major renovation. We are going to follow Option B from IPMVP Vol.3.

3
Default Avatar
Associate Director
The Rock Brook Consulting Group
LEEDuser Basic Member
6 thumbs up
Fri Mar 2, 2012, 10:13 pm

Design or Construction Credit?

Pilot-Credits EQpc24:Acoustics
posted by  Orlin Velinov, PE  on 

Is this s design or construction credit? From the credit form requirements looks like the NC levels will have to be measured, the rest criteria can be theoretically analysed or modeled.

3
Fri Mar 2, 2012, 7:45 pm

Parking Capacity overflow to Gravel Lot

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Eduardo Guzman  on 

We have a research building that shares an asphalt parking lot with a warehouse (used by the researchers but not being certified).

2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Fri Mar 2, 2012, 5:46 pm