Dear All, We are modelling a Baseline Building with System 8 “VAV + PFP boxes” using HAP by Carrier. We are wondering how to model the VAV + PFP boxes according to ASHRAE 90.1 Section 3.1.3.14.
Data Center Baseline systems
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.
Dear Sirs,
We are consultants
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Maya Karkour on
Dear Sirs, We are consultants for a mall seeking LEED. Most of the spaces will be tenanted.
Reviewr's Comment is requesting labor and delivery
CI-2009 MRc4:Recycled Contentposted by Sarah Thompson on
In all my 40 LEED projects I have never included labor and delivery to a material's cost total.
Min lux level for Project which has registered 5 months before
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by SSN Energy Model on
Hi Every one, Currently we are working for factory building project which has registered five months before under USGBC Rating system LEED 2009.
Pilot Credit 30: No new parking
Pilot-Credits PC30:Alternative Transportationposted by Jon Holway on
Where as multi-family apartment buildings need zoning required parking, as designers of senior independent living facilities, we have found that most municipalities will modify there zoning require
Eligibility for LEED - existing building structure
posted by Agnieszka Rylska on
Our client would like to certify a building that had its structural components and facade built a few years ago.
Dry-Fog coatings
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Lawrence Lile on
I am starting to see a specification for 3. Dry-Fog Coatings: VOC not more than 400 g/L. in MasterSpec and some projects' LEED specs.
wall mounted thermal controller
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Noriko Nagazumi on
Hi, Initial design review has just been returned for our project.
leed credit EAc4
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Dennis Ross on
Having built a cafeteria at a local University we are having trouble getting the Q (tons ) for some of the refrigerated display equipment.