Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Mastersite scorecard Construction Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susannah Goddard  on 

My project is a Campus project. All of the credits sought on the Mastersite scorecard are "Awarded" after Final Design Review (and appeal in some cases). What do I do now?

4
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Wed Apr 13, 2016, 2:13 pm

Density Calc which includes Marinas

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Michelle Rosenberger  on 

Our high rise apartment building is located in a fairly dense urban area. The project team felt pretty confident that we could make ID level density.

3
Tue Apr 12, 2016, 9:59 pm

Data center cooling

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have both space cooling and in rack chilled water cooling for computers. I wonder if the in-rack cooling is considered as process load or not.

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Tue Apr 12, 2016, 8:27 pm

air-cooled chiller condenser fans modeled separately?

NC-2009 EAp2:Minimum Energy Performance
posted by  Rob Pinkston  on 

Hello, Is it mandatory to break-out/model the condenser fans for an air-cooled chiller separately?

3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Apr 12, 2016, 8:01 pm

Case 1 vs Case 2

CI-2009 EAc3:Measurement and Verification
posted by  Brightworks Sustainability  on 

Our TI project is 4 floors of a large building, so

3
Tue Apr 12, 2016, 1:59 pm
2
Consultant
YRG sustainability
LEEDuser Basic Member
155 thumbs up
Mon Apr 11, 2016, 9:05 pm

EAp2 Proposed Design

CS-2009 EAp2:Minimum Energy Performance
posted by  James Wieben  on 

I have a CS project in Seattle and would like to use the local energy code as the basis of design for areas outside of the Owner's scope of work.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Apr 11, 2016, 3:41 pm

basic soil tests at design phase

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Charline SEYTIER  on 

Dear All, We are pursuing option 1 in one of our projects and want to submit it for Design Submission as this is a Design Credit. However Documentation requires "basic soils test(s) to demonstrate

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Apr 11, 2016, 3:24 pm

Hotel development - Multiple Buildings

LEED Rating System Selection
posted by  Charalampos Giannikopoulos  on 

Would a project including the development of a luxurious resort hotel be eligible for certification under v4 NC?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Apr 11, 2016, 8:38 am

Construction Waste Management-Multiple Buildings

NC-2009 MRc2:Construction Waste Management
posted by  Ian McCall  on 

Dear LEED-ers, Scenario : One single project, consisting of an office building (LEED Ceritified) & hotel building (NOT LEED Certified) in a very built up area with limited space.

2
Default Avatar
LEEDuser Expert
472 thumbs up
Mon Apr 11, 2016, 12:25 am