Can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized for credit compliance?
Healthcare-v4.1 EAc3:Advanced Energy Meteringposted by Keith Robertson on
For low-level metering of loads, greater than 10% can a non-revenue listed meter (or PTs and CTs integrated with the BAS) be utilized to collect data in accordance with obtaining&nbs
Option 1 Path 2/3 - Natural Ventilation and DES
CS-v4 EAp2:Minimum energy performanceposted by Azra on
Hello,
we got a kind of an unusal situation here, at least for us.
Modeling indirectly conditioned spaces
NC-v4 EAp2:Minimum energy performanceposted by Gaston Michaud on
Hi all,
We are working in a CS project, and just got back the following comment from the LEED Reviewer:
Modeling Proposed DHW with Insulation
NC-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi I am Modeling a DHW system and most of my savings are coming from Insulation in the heater tank, now the LEED reviewer said that the savings should be modeled with Exceptional Calculation MEthod
Onsite and Offsite Both?
Pilot-Credits SSpc83:Offsite Financial Support for Habitat Protectionposted by Umesh Atre on
Hi - Are projects that are pursuing the onsite habitat protection/restoration credit allowed to go for this Pilot in addition, or is this considered to be an alternate compliance path only?
Can ID+C be selected for whole building?
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Leo LeQuoc on
Our team is working on a project of a whole 2-storey (to be) newly constructed office building.
Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?
NC-v4.1 LTc5:Access to Quality Transitposted by Zabdi Valdez on
I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips.
Using BPFs from ASHRAE 90.1-2022 instead of 90.1-2016
NC-v4.1 EAp2:Minimum Energy Performanceposted by Mark Benson on
In the November 2023 issue of ASHRAE Journal, members of the 90.1 committee stated that 60% of the BPFs in ASHRAE 90.1-2022 have become less stringent than those in 2019 and some are even
Guidance on Onsite Compost Processing for SSpc129 / Pilot Credit
NC-v4.1 INc1:Innovationposted by Teresa Cortes on
Hi Everyone,