Forum quick links
Credit language
Pilot-Credits PC14:Walkable Streetsposted by Michael Beattie on
HI all, The language of this pilot credit and this discussion raises questions that I'd love to get clarification on: Is the required distance between street trees 45 feet (15 meters) or 450 feet
Pilot credit
ND-v2009 IDc1:Innovation and exemplary performanceposted by Noriko Nagazumi on
Hi, We are seeking oppotunity to achieve a point via pilot credit. We can find only one pilot credit applicable to ND in the pilot credit library in USGBC web site.
4.3 effic vehicle parking versus 4.4 car pool parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Noriko Nagazumi on
Hi, In a project where preferred parking are the parking spaces closest to the main entrance, is there any order when SSc4.3 placing low emitting and fuel efficient vehicles preferred parking and
Industrial zones
NC-2009 SSc1:Site Selectionposted by Emre Yöntem on
Hi all, Is there any exception for the areas divided for particular activity like industrial zones? Are these areas also undeveloped? Thanks in advance.
CxA
NC-2009 EAc3:Enhanced Commissioningposted by Jamal Uddin on
If the task of CxA complete in design phase now for my building but the building construction will be finished totally after 4/5 years from now.
Determining the Owner/Tenant % Controlled for ACP
CS-2009 EAc1:Optimize Energy Performanceposted by Joseph Petty on
I have a C&S medical office building that is 88% tenant space (by area) and am trying to figure out how to correctly document the owner/tenant % of the building energy cost for the Core and She
Autocontrol / metering urinals - 12sec or optional?
CS-2009 WEc3:Water Use Reductionposted by Petr Vogel on
Dear all, when calculating proposed case water consumption budget for public autocontrol / metering urinals…is there the same requirement like the 12sec requirement for public autocontrol / meteri
Combination of Test and Flush
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Michael McVinney on
On a hangar project, there is a conditioned Admin space and an unconditioned Hangar space.
Major Renovation vs. New Construction
NC-2009 EAp2:Minimum Energy Performanceposted by MT A on
We are working on a library project that involves the renovation of an existing facility, and the addition of a new wing.
DES option 1 points cap and EAc2 Renewable energy
posted by Adam Barker on
Under Option 1 of the DES guide, there is a 10 point cap. I have a project connected to a district chilled water system that I have modeled following option 1 which is showing 8 EAc1 points.