Forum quick links
Alternativ Simulations
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Ernst Schriefl on
Hi,
i have two questions about this credit:
Leed Interpretation 1080 in lieu of MEPC
NC-v4 EAp2:Minimum energy performanceposted by susan eguia on
Hi,
I'd like to ask, is anyone tried to use LI 10480 (Title-24 2016 Equivalency ) in lieu of Minimum Energy Performance Calculator (MEPC) for California project?
Box in a Box in another Box
CI-v4 EAp2:Minimum energy performanceposted by Waleed AlGhamdi on
Hi,
We have a LEED v4 ID+C CI project that is a substantial renovation. It's 8 floors and receiving a new HVAC system for the entire building, but there are many peculiar situations:
Custom Gypsum Product - General Emissions Evaluation
NC-v4 EQc2:Low emitting materialsposted by Allan Robles on
Hi LEEDUser community,
Dimmable Controls
NC-v4 EQc6:Interior lightingposted by Summer Gorder on
Do Dimmable lights suffice for individual workstation lighting control. It seems like theoretically you could provide the three different light level ranges required?
Too late for SSp1?
NC-v4 SSp1:Construction activity pollution preventionposted by André Harms on
A potential LEED project in Addis Ababa, Ethiopia, had already begun demolition and some construction activities before a LEED AP was appointed.
Compliance without showers on a mixed used project ( MAINLY RSIDENTIAL)
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Guillermo Hernandez Espinoza on
Hi everyone.
Is there anyway to comply if parking spaces is provided for bikes but no showers?
"Performance Period" duration
EBOM-v4 WEp2:Building-level water meteringposted by LEED Pro Consultant on
Hi, I want to know the performance period duration for the water efficiency prerequisite "Building-Level Water Metering". Thank you in advance,
Aerobic Biodigester
posted by Julie Hendricks on
We are looking at installing an aerobic biodigester in a commercial kitchen for an office client that is VERY concerned about zero waste. Basically, this system takes food waste, treats
Modeling Refrigerant Economizer for Data Center - proposed model
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi, We have an office building and it's data center room has a DX cooling with refrigerant economizer.