How many SF and which area of the building needs Bird Collision Threat.
Pilot-Credits SSpc55:Bird collision deterrenceposted by Miguel Rivera on
Hi, I'm a little confused.
All year round shaded area
CS-v4 SSc5:Heat island reductionposted by Frantisek Macholda on
Hi, we have a square atrium in the middle of the building.
Chemical Inventory for material other than chemical....
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by PAWAN DAHIWAL on
How does material which don't have any chemical content OR no chemical used during its manufacturing but is a permanent building material, comply with credit? For example Granite OR marbl
Are designated smoking areas required?
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Anna Kaelin on
My project prohibits smoking onsite and within 50 ft of the building. There are no designated smoking areas on the property.
Data Centre energy model baseline
NC-v4 EAp2:Minimum energy performanceposted by Ameet AA on
Hello,
For a large data centre, I was thinking the baseline should be:
- HVAC: system 8
- CRAC fan power: Ls x 0.0021 + A as per ASHRAE table G3.1.2.9
Mandatory. lighting controls for Proposed case
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Clarifications on No Cooling Tower Credit.
NC-v4 WEc3:Cooling tower water useposted by Priya Venkat on
Hi,
Clarifications in automatic lighting controls - Occupancy sensor, Programmable dimming control
NC-v4 EAp2:Minimum energy performanceposted by SAMY Chamy on
Dear Concern:-
we have industrial manufacturing with office building we have applied LEED V4 NC certification
Building Area Method and System designation
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello everyone, I have a project with the following conditioned area categorization.
1st to 5h Floor are composed by: