Phased Cx for a phased project
NC-v4 EAp1:Fundamental commissioning and verificationposted by Peter Doo on
We are working on a comprehensive renovation and addition of an Art Center at an independent high school.
Only commuter rail frequency complies with requirements
NC-v4 LTc5:Access to quality transitposted by Ricardo Sá on
Dear All
we are evaluating the possibility of certifying a distributrion center.
In what related LT C5 (“Access to Quality Transit”):
EPD Database
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Max Krueger on
Hi,
System 7 Reheat box leaving temperature
NC-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everone,
On-Site Renewable Purchase Agreement
NC-2009 EAc2:On-Site Renewable Energyposted by Kristen Gomez on
I am working on a project which install PV panels on the roof.
Infill Development points available for Previously Developed properties?
Homes-v4 LTc2:Site selectionposted by Edward Gulick on
The LEEDv4 for Homes Reference Guide is not explicit on whether a previously developed property is eligible for the Infill Development points. On the one hand, the suggested maximum point tot
Post-industrial and pre-consumer
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Kavita Karmarkar on
Hi all,
Documenting Master Site Credits
posted by Deborah Lucking on
I got this below from the LEED Help Center, which I find really confusing, and does not accord with the current LEED Online for Campus/Master Site format.
SRI value (or range) of FDOT #57 stone
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Heidi Carhide on
I'm working on a governmental project that uses Florida Dept of Transportation #57 stone as a landscaping material. The gravel is quarried in south Florida and is limestone rock. Does a