Forum quick links
Tenant Work: Tenant Sales or Tenant Neutral?
CS-v4 WEp2:Indoor water use reductionposted by Victoria Rios Esteve on
Hi everyone! Im quite new at LEED so I would really appreciate your help. Im working with the Water Efficency Credit 3: Water use reduction form.
Private application assisted living
NC-v4 WEp2:Indoor water use reductionposted by Neil Rosen on
Would the lavatories in the resident's rooms at an assisted living facility be considered a Private application?
Heat rejection
NC-v4 EAp2:Minimum energy performanceposted by Hagen Bork on
Can you define what "heat rejection" is? I'm not exactly sure which energy counts towards "heat rejection".
Emissions dans l'air intérieur
NC-v4 EQc2:Low emitting materialsposted by Francesco Passerini on
Do you know whether the French label "Emissions dans l'air intérieur" class A+ is valid for the credit requirements for interior paints?
Alternative requirements for buildings with high non-regulated loads
NC-v4 EAc5:Renewable energy productionposted by Tim Middleton on
We are working on a Manufacturing Project in Vietnam with very high non-regulated loads (around 75% of the total energy consumption).
Credit for been a green energy supplier
CS-2009 IDc1:Innovation in Designposted by Silvia Ruiz on
The company that owns the CS project is a green energy supplier that owns and manages hydropower plant that sells energy to the national grid, this energy will be used in the project, can this
Fixtures for Option 2 Lighting Quality, Strategy D.
NC-v4 EQc6:Interior lightingposted by Geoffrey Katz on
A recessed LED troffer type fixture may have an indirect light component by way of internal reflectors that reflect upward-directed light within the fixture back down onto the space below.
ID credit purchasing lamps - Copy of a legally binding tenant sales and lease agreement documentation
CS-2009 IDc1:Innovation in Designposted by Edgar Arevalo on
So this statement is concerning, "Please note that since LEED O+M is a whole building rating system, when attempting an Innovation in Design point for following a LEED O+M prerequisite or credi
SCL Whole Group Web Meeting - Contractors’ Commitment
posted by RoseAnn Grimes on
You're invited to join your colleagues in an SCL Whole Group Web Meeting on Contractors’ Commitment May 28th, 2019 1:00 PM PST / 4:00 PM EST!!