Forum quick links
Supporting Youth Climate Strike Sept 20
posted by Michelle Amt on
Hi everyone, on our SDL Regional Leaders call today we touched on how different offices are engaging with the Youth Climate Strike on Sept 20, and I offered to share a few resources that we've deve
Certified Wood Imported and Installed by Supplier/Subcontractor without COC
CS-2009 MRc6:Certified Woodposted by Mario S. on
I have a project for which the wood importer and subcontractor does not have a COC certificate.
Product with Melamine Formaldehyde Resins and Urea Formaldehyde Resins Meeting CARB Emissions
CS-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Mario S. on
I have a composite wood product that contains:
- Urea formaldehyde resin used as glue.
- Melamine formaldehyde resin as a coating.
Pilot Credit Requirment
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by Maria Fiorelli on
I recently pursued this credit for a LEED v4 ID+C office space. It appears as though the credit documentation was approved; although, none of the three products have full documentation.
Upcoming Call
posted by Jennifer Zakrzewski on
Hello everyone,
Here's a reminder that our next monthly call will be taking place next Tuesday, September 10th at 2:00pm EST.
Alternative methods of documenting an executed tenant lease agreement?
CS-v4 EAc3:Advanced energy meteringposted by Allan Robles on
Hi there LEEDuser-verse,
Indoor Water Use Reduction and Water Sense
NC-v4 WEc2:Indoor water use reductionposted by Jason Garvens on
On pg. 297 of the LEED v4 BD&C Reference Guide it states the general credit requirements but makes no mention of WaterSense labels being required there. However on pg.
Sound Transmission - Open Office Adjacency
CI-v4.1 EQc9:Acoustic Performanceposted by Tyler Cottrell on
How are Open Plan Office areas classified in terms of the Sound Transmission section?
Water discharge into Municipal STP
EBOM-v4.1 WEc1:Water Performanceposted by Kumar Biplab on
Background:- The building is part of a planned township and the township is maintained by municipality. Municipality also supplies potable water to the building through metered connection.