Do EAp2 have to be reviewed to be Design review phase?
NC-v4 EAp2:Minimum energy performanceposted by Thomas Tran on
Dear All,
I hope you all be fine during Covid-19 pandemic time.
Pilot credits eligible for Campus
NC-v4 INc1:Innovationposted by Chloe Naese on
Hi, I was wondering what pilot credits were eligible to pursue for the Campus approach.
2015 IECC Table R402.1.4 VS. ASHRAE 90.1-2013 Table A3.4.3.1
NC-v4 EAp2:Minimum energy performanceposted by Ying Lindsey on
Dear all,
I have a question regarding the low rise multifamily builidng wall U-factor.
LEEDv4 marine plywood
NC-v4 EQc2:Low emitting materialsposted by Sophie Kerr on
Hello,
Has anyone found marine grade plywood which meets formaldehyde emissions or is exempt for LEEDv4.
Thank you,
Sophie
Documentation for LEED campus
NC-v4 MRp1:Storage and collection of recyclablesposted by Chloe Naese on
I was wondering what documentation should be submitted for this credit if we are pursuing LEED campus?
Calculating contribution by surface area
NC-v4.1 EQc2:Low-Emitting Materialsposted by Xavi Ramon on
Hi all!
I have some doubts about how to calculate the surface area that contributes toward this credit.
Can shared vehicles that do not have stops be considered public transport?
NC-v4 LTc5:Access to quality transitposted by Kavita Suresh on
Is there any guidance for passing shared vehicles (e.g. not stopping at the site) to be considered public transport?
Benchmark against Historical Data
Warehouses-EBOM-v4 EAp2:Minimum energy performanceposted by Omar Elrawy on
I have a case of a manufacturing facility, in which my only option is to compare against historical data.
Passive House Detailing
posted by Kate Bubriski on
Does anyone have a Passive House detailing resource recommendation? Something that is applicable to wood over podium and/or metal framing construction?
BUG Method
NC-v4 SSc6:Light pollution reductionposted by Heather Holdridge on
I'm using the BUG method for this first time to document this credit. To confirm, is it correct that there is no limit on number of fixtures, so long as the BUG rating complies? I want