Forum quick links
Core and Shell: What does incomplete mean?
posted by Stephan Zweig on
Hello to everybody,
OPR and BOD docunets
posted by Stephan Zweig on
Hello,
at the LEED on line platform for the LEED Documentation do we need to upload the documents
Owners Project Requirements (OPR) and the Basis of design (BOD)?
Baseline System for District Energy System (DES) Option 2
NC-v4 EAc2:Optimize energy performanceposted by Keith Lane on
I'm working on a 73,000 s.f. clasroom building that has air-cooled chiller and boiler plants connected to a seperate building so need to follow the DES guidelines.
Selection of baseline system type for industrial object - Number of floors Vs area
NC-v4 EAp2:Minimum energy performanceposted by Anna Korinkova on
Hello everyone,
Modification of the lighting boundary - 4 lane street
NC-v4 SSc6:Light pollution reductionposted by Anna Korinkova on
Hello everyone,
I would like to ask for a clarification related to the allowed modification of the lighting boundary.
V4 BDC Multifamily Midrise LEED AP Homes point out of reach
NC-v4 INc2:LEED Accredited Professionalposted by Sue Bryant on
The V4 requirement is for a LEED AP Homes to be on the project team. That team member, however, cannot be part of the verification team.
LEED projects registered before April of 2022
posted by Allen Cornett on
Yesterday morning I tried to edit LEED Online forms in several projects. When I clicked on the form a message popped up saying, “Your browser is incompatible or you have chosen to access the
CO2 Sensors for Phonebooths
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by LEED Pro Consultant on
Hello our project is 3 office floors with some spaces destined only for phonebooths wich are only designed for 1 person, however because of the small area the calculations to obtain occu
What threshold of reverberation time to apply for Performing arts Space / ballroom?
NC-v4 EQc9:Acoustic performanceposted by Sara BENLOUBA on
Hi everybody,
GCCA EPD Tool
NC-v4.1 MRc2:Environmental Product Declarationsposted by Celeste Ceballos on
When requesting EPDs to our concrete manufacturer, we were given EPDs generated via the Global Cement and Concrete Association's EPD Tool.