Forum quick links
Exhaust energy recovery units
NC-v4 EAp2:Minimum energy performanceposted by Samer Hassanie on
Hi,
We have been getting the following comment from several reviewers:
When a material data sheet does not have SR
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Mariana Guevara on
Sometimes a material data sheet does not have SR and or TR. Is there a material standard that can be used as refrence to obtain the SR and TE values?
v4.1 O+M: working with a new building
posted by Victoria Rios Esteve on
Hi everyone,
Ozone Monitoring
posted by Sharon Bessa on
Is the Aeroqual OZL approved for ozone testing?
Does Boston's MBTA Silver Line count as Bus Rapid Transit?
NC-v4 LTc5:Access to quality transitposted by Eric Dammeyer on
Our team is working on a project in Boston located near the MBTA Silver Line (0.46 miles from the Silver Line Way stop).
LEEDv4 MRc1 Option 4 Whole-Building Life-Cycle Assessment
Schools-NC-v4 MRc1:Building life-cycle impact reductionposted by Theresa Lehman on
Has anyone used any life-cycle assessment software? If so, what was the software? How long did it take to produce an assessment? What the software free?
Seasonal Commissioning
NC-v4 EAc1:Enhanced commissioningposted by komal m on
Is seasonal commissioning required or optional for proejcts? Is seasonal commisioning applicable for tropical areas, as there is hardly any seasonal variation observed throughout the year?
FSC Invoices, Chain of Custody, and Certified Wood Cost
CI-2009 MRc7:Certified Woodposted by Eric Thompson on
I'm working on a project in Norway and I'm somewhat confused about the documentation for Certified Wood. The Reference Guide states: Collect all *vendor* invoices for permanently installed wood p