Forum quick links
100% OA SYSTEM?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Weidong Luo on
an AHU with no return air supplies 100% OA to an office and a conference room with FCUs, the OA supply ducts connected to the FCU supply ducts.
Energy Model documentation and a why is it so...
posted by Jesse Robbins on
Tristan, Thanks for your offer to get answers. I don't yet have experience in a LEED v4 project, but have been unable to find documentation on using initial vs.
Hexavalent Chromium on groundwater
NC-2009 SSc3:Brownfield Redevelopmentposted by eirini matsouki on
Hi all, Our project is international and is under construction. We are keeping this credit on a stand-by, as during the design submission there was not any evidence of contamination.
Beta Testing
posted by Melissa Wrolstad on
When will USGBC post the results of the LEED Beta Testing?
MINIMUM IAQ AND FTE
NC-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
I have had this doubt from a long time, is the occupancy assumed for IEQ calculations related to FTE?, and if so, in which wa?, Thank you
IEQc4.1,c4.2 & c4.2 Add to v2009 to v4 substitutions list
posted by Ian McCall on
Dear Tristan, I am currently working on European based LEED 2009 (V3) registered projects. Apparently LEED V4 credits IEQ c4.1, IEQ c4.2 & IEQ c4.4 now accept local VOC content regulations as a
LEED Documentation for Steel Subcontractor
NC-2009 MRc4:Recycled Contentposted by Shaunna Shaw on
I work for a construction company that does steel fabrication and erection.
ASTM tests for BECx
Healthcare-v2009 EAc3:Enhanced commissioningposted by Alicia Villanueva on
Hallo, we are trying to pursue Option 3 1.We are encountering difficulties finding a provider to test a window assembly under ASTM-331.
MPR6 - C&S and CI
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Emily Clark on
We are currently working on a Core & Shell project where a single tenant will be occupying the entire building. That tenant is also going for LEED under Commercial Interiors.
FTE for a bank branch
posted by Jessica Garcia on
I'm calculating the FTE for a bank branch, how can I calculate visitors?