Forum quick links
Site Assessment on an existing site
Warehouses-NC-v4 SSc1:Site assessmentposted by Sofia Barahona on
We are currently working on a warehouse project that is an extention of an existing warehouse.
Calculations for demountable partitions
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Marie Miller on
I'm working on a TI project and we're trying to get the Design for Flexibility point. When calculating for this credit, do we use linear feet or square feet of the product?
Group approach - Minimum requirement compliance
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hello everyone!
I am working on 2 buildings that are registered in one project following the group approach.
How to represent product-specific EPDs with LCA tools which don't cover them.
NC-v4.1 MRc1:Building Life-Cycle Impact Reductionposted by on
While we are getting up to speed on using OneClick LCA in our practice, most of our project LCAs are still in Tally, which currently has a more fixed database of materials.
Process consumptions
Warehouses-EBOM-v4.1 EAp3:Energy Performanceposted by RICCARDO BALLESIO on
We are analysing the electrical energy consumption of our client. The building is a warehouse of approximately 10.000 sqm with 1000 sqm of offices.
Ventilation
Warehouses-EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by RICCARDO BALLESIO on
All office spaces are naturally ventilated. The minimum opening location and size requirements are satisfied for all offices, restroom and meeting rooms.
Job Opening! Manager of High Performance and Sustainable Construction
posted by Susan Heinking on
Looking to make a difference on the Construction side of the industry? Come join Pepper Construction! We are a midwest based GC but build all over the country in mutliple markets.