Forum quick links
Is there OR between options or AND?
NC-v4 LTc5:Access to quality transitposted by Faran Arshad Chohan on
Do we have two options for this credit:
1. locating the project within 1/4 mile radius
2. locating the project within 1/2 mile radius
or we have to fulfill both requirements?
Humidity controls in baseline model
NC-v4 EAp2:Minimum energy performanceposted by Nicolas Martinez Ochoa on
Hello everyone,
IARW/IACSC Energy Modeling Guideline for Cold Storage
CS-v4 EAp2:Minimum energy performanceposted by Eric Dyer on
Hello
We are working on a project where room temperature warehouse and refrigeration warehouse are mixed.
Industry Decarbonization Opportunity: Your firm to sign-on to US DOE letter Heat Pump Water Heaters
posted by Chris Flint Chatto on
Green Gurus –
When Did the v4 Water Metering Credit Change?
NC-v4 WEc4:Water meteringposted by on
On our last two projects we've gotten a comment indicating that we need to remove the usage of "electric water coolers, janitors sinks, swimming pool, laundry, commercial kitchen, salon sink..."&nb
WAREHOUSES - IAQ PERFORMANCE CALCULATOR
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Antonio Cajas on
Hello everyone,
Cool wall requirements valid for colder climate zones?
Pilot-Credits SSpc154:Heat Island Mitigation with Cool Wallsposted by Brian Trimble on
Some jurisdictions across the US are starting to address the heat island effect by instituting various requirements for cool roofs and pavements.
How many type of C & D waste to be recycled
NC-v4 MRp2:Construction and demolition waste management planningposted by Osman Faroq on
Dear all,
Good Day,
Option 3 - Transit corridor
ND-Plan-v4 SLLp1:Smart locationposted by Vanessa Rosado on
Hello Leed user Team
Adhesive used in the project to bond laminate to wood substrate
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Marie Kranjack on
We just had this credit denied in our Design and Construction Final Review.