Discrepancy between credit requirements and credit specifics
Pilot-Credits MRpc52:Material multi-attribute assessmentposted by Jody Lee Potvin-Jones on
I'm having a hard time understanding why it is necessary to document cost, weight and "percentage of product contributing to this criterion", if the requirements are simply to use 20 different pro
Rack location
Healthcare-v2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Gustavo De las Heras Izquierdo on
Verbatim from the rating system: "Provide secure bicycle racks and/or storage within 200 yards of a building entrance" May we place half of the racks next to the staff's entrance and the other half
Natural Stone : Floor Score compliance required or not for ?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Ammar Yahia on
We have a situation here, for the scope of finishes company's materials submittals. the query wither the compliance with Floor score or any stringent third party is applicable or not for Natural St
Can we administer survey on multiple days?
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Helen Samuel on
I have a project that has operations 7 days a week. About 75% of workers come to the site Mon-Thu, and the other 25% of the workers come to the site Fri, Sat and Sun.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Where do I upload the response report for Design Final Package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Where do I upload the response report for Design Final Package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
Stormwater not going to municipal infrastructure
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Michael Wahjudi on
We have site that is located about 600m from the sea, hence the stormwater will be discharged to the sea instead going to municipal infrastructure.
Exemplary performance
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by LEEDme Lorenzi on
Our project is a renovation located near a metro station and near four bus stop.