Federal (DoD) Guiding Principles Assessment expertise needed
posted by emily reese moody on
Hey all,
Energy Metering Displays
NC-v4 EAc3:Advanced energy meteringposted by Allison Para on
Hello Pros,
I am working on a student residential building (NC) that will have advanced submetering for the 5 floors.
Existing Parking Lot
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Laura Soma on
If building next to an existing parking lot, which will serve the new structure, does the parking lot footprint need to be included in the LEED project boundaries? Assume there will be minor
Retail FTE Access
CS-v4 LTc6:Bicycle facilitiesposted by Michelle Rosenberger on
This core and shell office building has retail on the ground level. There are locker rooms and bike storage on this level but no direct interior access from the retail spaces to these facilities.
Electric vehicle charging station used in demand response strategy
NC-v4 EAc4:Demand responseposted by Martina Salonen on
Hi!
All-SCL Call Survey
posted by Amanda Farman on
Hi everyone, we had a great first all-network call with the SCL members who joined us last month! We’re looking forward to the next all-SCL call on January 8, 2024 at 1pm ET.
Healthcare-v4.1 MRc6: PBT Source Reduction - Lead, Cadmium, and Copper
Healthcare-v4.1 INc1:Innovationposted by Ann Busker on
Good morning,
Increased Ventilation 15% and 30% - does it count as 2 strategies?
CI-v4.1 EQc1:Enhanced Indoor Air Quality Strategiesposted by Lidia Johansen on
Hello
If we achieve increased ventilation by 30% - does it count as 2 strategies (15% and 30%)?
Thanks
Lidia
LEED certification for open spaces
posted by Sergio Acevedo on
We would like our expansion project to be LEED certified.
There will be no physical separation between the existing building and the extension (no walls).
Does adding "green, pool and EV's" to parking onsite, yet outside our LEED Boundary, comply with these credits' intent?
Warehouses-NC-v4 LTc8:Green vehiclesposted by Blake Jackson on
I'm working on a 455,000gsf expansion of an existing facility, which will have all new/standalone systems to support the new wing.