LEED ND GIB credit 4 - Water efficient landscaping
posted by Tyler Baker on
I am working on a residential redevelopment in a mature inner suburb.
RE:62MZ calc. spreadsheet Vdzd & Ds inputs
CI-2009 IEQp1:Minimum IAQ Performanceposted by Bobby Ghataura on
In the 62MZ calc, i created zones that have heating and potentially critically zones, but im having an issue with the results; for Vdzd, i enter the airflow rate that corresponds to the minimum VAV
Opt. 2: Average density residential area
CI-2009 SSc2:Development Density and Community Connectivityposted by Marco Abdallah on
We have a project in the center of Paris where we want to pursue option 2 of this credit.
Baseline system selection
NC-2009 EAp2:Minimum Energy Performanceposted by Jane Long on
I'm modelling a European Industrial project where nearly a 5th of the floor area is a specialist process area, similar to a clean room or laboratory, however used for industrial processes, in use 2
Regularly Occupied Spaces
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Amit Vaswani on
Hey Guys, We're designing a facility with Classrooms and Private Offices for 6 regularly occupied employees.
Refrigerant Calculator and Thermal Storage
NC-2009 EAc4:Enhanced Refrigerant Managementposted by James Keohane on
Which tonnage should be used when using refrigerant calculator while considering a chiller plant serving a static ice thermal storage system?
4 floor building - 2 phases
posted by shawn jang on
I have a 4 floor building in china, it’s a manufacturing facility.
Tradable or untradeable surface?
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
On the site of the building which I’m modelling there is a floodlight that is placed on the external ground and that lights the external facade of the building.
Irrigation sub-metering - water tank
EBOM-2009 WEc1:Water Performance Measurementposted by Anna Korinkova on
Our project will build a water tank which will provide enough water to irrigate 100 % of our greenery.
Construction Preliminary Review as Final
posted by Joseph Greene on
We selected the split review process and recently received Construction Preliminary Review comments.