Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

RAVOCs

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Eduardo Guzman  on 

Our contractor would like to use a flat pain that gives both a VOC content measurement and a RAVOC content measurement.

1
Fri Jun 8, 2012, 5:21 pm

Floodlight

NC-2009 EAp2:Minimum Energy Performance
posted by  Ameet AA  on 

2. Lighting requirement from ASHRAE 90.1-2007 Appendix G?

1
Fri May 18, 2012, 4:57 pm

Can I use CONTROL as an energy saving strategy??

CS-2009 EAp2:Minimum Energy Performance
posted by  Esteban Undurraga  on 

Dear all: We have an specific question related to the Whole Building Simulation of an office Building. The electricity distribution company established a maximum limit of energy use for the buil

1
Mon May 21, 2012, 12:13 am

Detailed Plant Simulation

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Chilufya Lombe  on 

Hi, we have a project with a certain number of 'back up' systems for air conditioning.

1
Tue Jul 3, 2012, 6:37 pm

Can the Technical Controller on the project be the CxA as well?

NC-2009 EAc3:Enhanced Commissioning
posted by  Maya Karkour  on 

Hello, We are working on a project which seeks to achieve EA c3.

1
Mon May 21, 2012, 1:02 pm

Core Shell Version 2.0

CS-2009 EAp2:Minimum Energy Performance
posted by  Carolina Vergnano  on 

Hello, I would like to know if on the old version, using the energy simulation based on Std.90.1-2004 Appendix G, to comply with the prerequiste the proposed needs at minimum to be equal to the Ba

1
Mon May 21, 2012, 4:51 pm

glass

Schools-2009 MRp1:Storage and Collection of Recyclables
posted by  Lisa Logan  on 

I am an on-call LEED consultant for the local public school system. They do not allow glass on any school campus - school policy.

1
Thu Jun 7, 2012, 12:01 am

Material Avoidance ID?

CI-2009 IDc1:Innovation in Design
posted by  Jonathan Weiss  on 

I am working on a project where the design team wants to eliminate the majority of ceilings and flooring and go with painted deck above and polished concrete below.

1
Thu Aug 30, 2012, 6:10 pm

Water consumption for Hotel Kitchen Sink

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  GPS Development   on 

We are working on a hotel project and encountered some qns: 1. Kitchen Sink faucet There is no kitchen in the hotel room but kitchens for restaurants. two scenarios: (1) washing hands etc.

1
Tue May 22, 2012, 3:50 pm