Rated Power for Projector
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Joseph Greene on
Hi All, Could you help me find the rated power for a NEC projector Model # P350W? I called manufacturer and they couldn't help me out. Thanks!
Total Vehicle Parking Capacity
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by April Ambrose on
In a gas station, would the fuel pumps count towards total parking capacity, seeing that many people who stop for fuel and something from inside the store only "park" at the pump?
Reduced Parking Footprint
posted by Bob Korp on
A project with a zoning requirement for 100 spaces may not build 101 if it hopes to earn the LEED credit, but cannot build 99 and meet zoning.
Is a landscape architect required to document this credit?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Elle Brown on
Can this credit be achieved without a landscape architect?
Does Alternative Daily Cover count as Waste Diversion?
CI-2009 MRc2:Construction Waste Managementposted by JaDee Harsma on
We are shooting for 95% waste diversion on our LEED-CI 2009 project.
Any change on accepting CARB phase II ?
CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Susan Di Giulio on
I have been having an ongoing back and forth with a bamboo plywood and flooring distributor about a few products that they import form China.
7 Working days
posted by Diaa Madkour on
Hi all, We are working on a call-center office building. The employees will be working 7 days a week. with 3 shifts a day. We have a confusion with calculating the FTE.
Open-grid paving
NC-2009 WEc1:Water Efficient Landscapingposted by Paula Rantanen on
Does anyone know if open-grid paving is qualified as vegetated area?
FTEs or Residents for Mixed-use residential project?
posted by Joel Cesare on
Our project is 4 floors: first floor with three commercial tenants and top 3 residential. The occupant numbers for the residential is straight-forward based on LEED default values.
Parking in basement
posted by Aldo Pazo on
Good morning, We are working on a 22 story office project. The building has also 3 stories below grade that mixed parking (250 parking spaces) and other uses (Auditorium, etc.).