Forum quick links
Misunderstood case 1
CS-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Stéphane Paris on
I'm working on a project in an urban space that have Local Zoning Ordinance.
Another CxA Scenario?
NC-2009 EAc3:Enhanced Commissioningposted by Christopher Heine on
We have a project over 50,000 sf in DD phase and are in early talks with a potential Facility Manager. Can a FM or a disinterested party from that FM firm serve as a CxA for EAc3?
IEQp2 - EBO+M
posted by SIG - Sustainability Main Account on
Recently, IEQp2 for EBO+M projects are also requiring additional documentation that is not clearly requested in reference guide or on LEED Online.
IEQc3.5 - EBO+M
posted by SIG - Sustainability Main Account on
Another issue with existing buildings is with previously existing permanently installed walk-off surfaces.
Energy Modeling with California T24-2008
NC-2009 EAc1:Optimize Energy Performanceposted by eileen hughes on
Will the GBCI accept the model if it is completed based on Title 24 -2008 energy standard in lieu of the T24-2005 or ASHRAE 90.1-2007?
Flexibility
NC-2009 IDc1:Innovation in Designposted by Denise Newbould on
Is it okay to pursue more than one path to obtain ID credits?
Required Signatory IEQp2-1 form?
Schools-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Joel Register on
On the form for this credit, there is an option to upload IEQp2-RS1.
How to define the "project's energy-related systems"?
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Andrew Gil on
I am seeking clarity on this point given the GCBI's June 2011 update of MPRs and the current emphasis on defining a project "in it's entirety".
IEQc4.2
posted by Tristan Roberts on
Anatoly, please see the requiements and discussion under IEQc4.2—I think that's where this would fall.
Existing System with New Chiller Plant
NC-2009 EAp2:Minimum Energy Performanceposted by Ante Vulin on
Our project is an existing 36,000 sf museum with a planned 18,000 sf addition. The existing portion is served by a dual-duct HVAC system with a boiler and chiller plant.