Forum quick links
Pilot Credit Content?
Pilot-Credits EQpc22:Interior lighting - qualityposted by Jonathan Weiss on
The content listed here on this page differs from the current content on the USGBC website - they have a similar but different set of requirements listed. Which one is currect?
Water heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
I have to model a building which is using solar pannels electric heaters.
Cumulative Facade Intrusion?
Pilot-Credits PC14:Walkable Streetsposted by Kimberly Frith on
Our project has two facades extending along sidewalks. Going by the credit requirements, we cannot have more than fifty feet of blank facade.
Residential Bike Storage in Apartments?
Pilot-Credits PC13:Bicycle Network, Storage, and Changing Roomsposted by Kimberly Frith on
The construction requirements for the bicycle storage seem to suggest centralized bicycle parking.
Public tranportation Access
CI-2009 SSc2:Development Density and Community Connectivityposted by ANDREW MOISEEV on
We have a bus stop right outside our door and a second route a mere .32 miles away, will that be acceptable, how hard and fast is the 1/4 mile rule?
bicycle storage and changing rooms
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by B MS on
We are working on a mixed used (commercial and residential) building. We have FTE 421 in commercial whereas total no. of residents is 28. the peak transients is 731. we calculated the no.
Is it possible to get post development run off in negative?
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by B MS on
Our project is located in Kathmandu, Nepal and I have a few questions regarding the following points. 1.
Required Number of Construction Inspections?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Benjamin Tressler on
Does LEED specify a required number of commissioning inspections during construction? We are trying to develop a scope based on the minimum requirements of LEED.
Facility Alterations in a garage
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Chris Munn on
We are working with a property that will be undergoing facilty alterations and additions in the parking garage. The property will be adding a small office in their parking garage.
ANSI S12.60-2002 vs LEED Template
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Brian Moran on
The ANSI S12.60-2002 standard requires that core learning spaces, between 10,000 and 20,000 cubic feet, have reverberation times that do not exceed .7 seconds.