Calculating Walking Distances
ND-v2009 SLLc3:Locations with reduced automobile dependenceposted by Vita Shklovsky on
What are some common methods of measuring walking distances?
equipment
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Oleg Petryuchenko on
if we have manufacturing equipment on the floor and all area is daylit through skylights, providing even lighting level across the space do we need to exclude sq.
Do I have to use DES Guidance?
posted by JOSE R. TAGLE on
We´re working on a Resort LEED Project (one owner) conformed by a Hotel, service buildings, SPA and villages, LEED boundary is considering only Hotel and Service Buildings, however, Cooling Plant (
Number of cycles
EBOM-v4 WEc3:Cooling tower water useposted by Jonathan Miller on
What is the number of cycles necessary to achieve 1 point? 10?
Scope of EAp2 we must include to meet the compliance
CI-2009 EAp2:Minimum Energy Performanceposted by Takayuki Hirota on
We are planning to renovate an existing building which is used as an office, aiming for LEED CI certification.
MERV for Filters
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Farah A. on
Are MERV 13 filtration media used for temporary or permanent air handlers?
LEED-CS vs LEED for Homes
posted by Beth Nelson on
Please advise whether you think LEED-CS is the appropriate rating system for the project, giving the following: - The project involves converting an existing 2-story warehouse into condos.
LEED EBOM group certification
posted by Isabel Santos on
Dear all, I have a question about LEED EBOM group registration and certification fees.
LEED BD+C Question- Individual Thermal Comfort Controls
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Farah A. on
A project design team has design their new office space with an open office plan and operable windows to provide natural ventilation.