Forum quick links
Lighting Controls
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by shaun Andriano on
Our IEQc6.1 credit was approved during the design phase based upon the following: The space is a large open area with cubicle workstations.
Submittals - does one need to upload spec sheets?
CI-2009 WEc1:Water Use Reductionposted by Patricia Ewanski on
Simple question - My project is not yet registered so I can't see what documenation is necessary to substantiate claims of water efficiency.
LEED certification without heating and cooling systems
NC-2009 EAp2:Minimum Energy Performanceposted by Felipe Duran on
I am working on a school project and it does not consider a heating system nor a cooling system at all ¿Is it possible to certified a building which does not have a these systems and therefore the
Commingled materials?
CI-2009 MRc2:Construction Waste Managementposted by Habitech Distretto Tecnologico Trentino on
Hello. We are working on a CI project. We have only three types of waste (mixed materials, mix of concrete and mix of gyps), with three different containers.
economic assessment
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Pablo Fortunato Suarez on
What the client has is a project for proposed upgrades since the building is quite old, making upgrades necessary.
outdoor air unit system type
NC-2009 EAp2:Minimum Energy Performanceposted by Ana Davidovic on
I have a project that is classified as a high rise residential building.