Fan power BaseLine
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello everybody, I´m simulating a LEED Project. When calculating the powers of the fans as G3.1.2.9, the result is adequate.
Option 2 for site that is partially zero-irrigation
EBOM-2009 WEc3:Water Efficient Landscapingposted by Lyle Axelarris on
Some portions of the site are irrigated, while other areas are not. Non-irrigated areas include adapted grass,shrubs and trees which are shaded by the building and do not need irrigation.
Boiler efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by Mike D on
Hi, For the modelling input, should we use gross efficiency of the boiler or net efficiency? We tried to check what ASHRAE uses as a baseline but could not find anything. Many thanks!
M&V
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Florinda Garcia on
i am participating in a CS project, the building is a comercial office building all the office space will be for tenants.
U-factor for fenestration in the Proposed Model
CS-2009 EAp2:Minimum Energy Performanceposted by Ron Dean on
Hello everyone, I'm in the process of filling out the table 1.4 for LEED EAp2 submission, my question is about this ''How were the Proposed case framed assembly fenestration U-factors determined?'
CxA qualification?
CI-2009 EAc2:Enhanced Commissioningposted by Torsten Biernat on
We have a project (
regularly occupied sf
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
1) Why is column regularly occupied sf in leedonline EAp2-1 table needed? 2) We have filled out EAp2-1 as per the spaces used in the energy model, not the project per say...i.e.
Full extent of documenting hazardous chemicals and gases
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Sean Hogan on
Hi, I have project seeking certification that has cooking demonstration rooms, flavours laboratory and a staff cafeteria.
Walk-off mats within a vestibule
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Colin Day on
Would walk off mats under 10 feet in length be sufficient to meet the credit requirements if they are located within a vestibule? Thanks for your help...