Forum quick links
temporized faucet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by LEEDme Lorenzi on
The water use reduction additional guidance says: the flow rate is determined using the flow rate in gallons per minute (gpm) and the duration setting (in seconds) for the metering faucet.
Coconut Fiber
NC-2009 MRc6:Rapidly Renewable Materialsposted by María Fernanda Aguirre on
Hi! Can coconut fiber count as both, recycled content (pre-consumer if coming from coconut sub-products industrial process) and a rapidly renewable material as well?. Thanks
LEED CI Project Boundary - Non-conjoining Spaces
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Matthew Catterall on
We have a project for a single entity that owns and occupies an entire building. They are required to achieve LEED silver on this renovation per their local code.
CAPP Plan
NC-v4 SSp1:Construction activity pollution preventionposted by UGC/GPRO Office Account on
Hello, Does anyone have a Construction Activity Pollution Prevention plan example? What does it include? Erosion control, light pollution prevention, stormwater management plan
Exterior Radiant Heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Seth Penchansky on
We are considering LEED certification for a four season golf range hitting facility that will have hitting areas with overhead radiant heaters and indoor conditioned areas as well.
Submittals - requirements
Pilot-Credits EQpc78:Design for active occupantsposted by Lily Li on
General:Register / Participate in the LEEDuser pilot credit forum / Survey Credit Specific:Plan & narrative, Participate - have a account or contribute to the discussion?
Compliance with Core Performance Guide Sections
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ron Dean on
Hello everyone, I'm working in a smal project (just 2 floors) that is naturally ventilated overall.
Possible Exemption?
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by Alexis Thompson on
Our project building has 5 AHU systems; 4 of them significantly exceed ASHRAE (200%, 130%, 363%, 41%). The building is a laboratory and has very stringent requirements for OA delivery and IAQ.
MPR for LEED 2009 ND
ND-v2009 PIf1:Development Program and Site Typeposted by Jin Yang on
Hi Eliot, Currently I'm working on a LEED ND project in Wuhan, China.
Donnations in the Materials Credits calculation
Schools-2009 MRc4:Recycled Contentposted by Nader NAKIB on
We are working on a project for an NGO that is seeking a LEED-NC certification for their new office building. The NGO will be receiving many donations from local suppliers and businesses as well.